Thursday, December 8, 2011

ConnDOT eAlert: Construction News from the Connecticut Department of Transportation

Utility Work on Route 7 Expressway in Brookfield

The State Department of Transportation is announcing that utility work will be performed on the Route 7 Expressway (Southbound) just north of Exit 12 (Federal Road) in Brookfield on Sunday, December 18, 2011.

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=492224

Wednesday, December 7, 2011

ConnDOT eAlert: Construction News from the Connecticut Department of Transportation

Traffic Control Update on Route 1 in Guilford

The Connecticut Department of Transportation is announcing that it is developing plans to revise the traffic control signal to update the existing equipment and provide an exclusive pedestrian phase at the intersection of Route 1 (Boston Post Road) at State Street in the Town of Guilford.

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=492142

Monday, December 5, 2011

ConnDOT eAlert: News from the Connecticut Department of Transportation

Emergency Aircraft Arresting System Unveiled at Groton-New London Airport

Federal Aviation Administration Regional Administrator Amy Lind Corbett and Connecticut Department of Transportation Commissioner James P. Redeker today unveiled the newly installed emergency arresting system at Groton-New London Airport designed to stop planes that overshoot the runway. It is the first such system installed in Connecticut.

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=491976

ConnDOT eAlert: Merritt Parkway Trail Study

Merritt Parkway Trail Study


For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=4185&Q=491882

Friday, December 2, 2011

ConnDOT eAlert: Construction News from the Connecticut Department of Transportation

Lane Closures for Bridge Safety Inspections Beginning December 5, 2011.

Lane closures will be required around Connecticut for bridge safety inspections and evaluations beginning Monday, December 5, 2011. View the complete list.

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=491886

ConnDOT eAlert: News from the Connecticut Department of Transportation

Governor Malloy, Fairfield Officials, DOT Cut Ribbon on New Fairfield Metro Rail Station

Governor Dannel P. Malloy today joined Fairfield First Selectman Michael C. Tetreau and other state and local officials to mark the opening of the Fairfield Metro railroad station. The $90 million station, which will open for commuter service on Monday, December 5, also includes 1,400 parking spaces.


For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=491884

ConnDOT eAlert: Construction News from the Connecticut Department of Transportation

Removal of Storm Debris on Route 8 (northbound) in Thomaston

The Connecticut Department of Transportation is announcing that the removal of storm debris will require lane closures on Route 8 Northbound between Exit 40 (North Main Street) and Exit 41 (Campville Road) in Thomaston. This work is scheduled for Saturday, December 3, 2011.

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=491878