Tuesday, March 20, 2018

ConnDOT eAlert: Construction News from the Connecticut Department of Transportation

Nighttime Maintenance on I-95 Q Bridge in New Haven

The Connecticut Department of Transportation is announcing that nighttime bridge maintenance project will be performed on the Pearl Harbor Memorial Bridge, northbound and southbound, on I-95 in New Haven, beginning at 8 p.m. on Tuesday, March 27, and concluding at 6 a.m. on Wednesday, March 28, 2018.

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=601396

Monday, March 19, 2018

ConnDOT eAlert: News from the Connecticut Department of Transportation

Weight Restrictions Imposed for Cribari Bridge (Route 136) in Westport

The Connecticut Department of Transportation (CTDOT) today announced a 20-ton vehicle weight restriction for the William F. Cribari Memorial Bridge, the historic swing bridge carrying Route 136 over the Saugatuck River in Westport. The decision to impose the restrictions – beginning Tuesday, March 20, 2018 – was the result of the ongoing structural engineering evaluation and inspection of the load capacity of the 19th Century truss bridge.

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=601364

Monday, March 12, 2018

ConnDOT eAlert: News from the Connecticut Department of Transportation

Hartford Rail Line Construction Update -- Town of Windsor

Due to the recent winter weather, work along the Hartford Rail Line in Windsor has been postponed until next week. The work will now begin Monday, march 19, 2018.

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=601234

ConnDOT eAlert: Construction News from the Connecticut Department of Transportation

Public Information Meeting Concerning Interchange 58 Improvements on Route 15 at Route 34 in Orange

The Connecticut Department of Transportation (Department) will conduct a public informational meeting concerning the proposed Interchange No. 58 improvements on Route 15 at Route 34 on Wednesday, April 4, 2018 in Orange at the Town Hall (617 Orange Center Road, Orange, Connecticut 06477). An open forum for individual discussions with Department officials will begin at 6:30 p.m., followed by a design presentation at 7:00 p.m.

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=601210

Tuesday, March 6, 2018

ConnDOT eAlert: News from the Connecticut Department of Transportation

Town of Windsor -- Hartford Rail Line Update

Construction at several street-level railroad crossings in the town of Windsor will take place later this month. The crossings will be closed to through traffic during this work.

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=601144

Friday, March 2, 2018

ConnDOT eAlert: Construction News from the Connecticut Department of Transportation

I-84 Waterbury Construction Update - Pending Closure and Detour

The Connecticut Department of Transportation is announcing that upcoming steel removal operations on the Scott Road Bridge will require a closure and detour of I-84 westbound for two nights followed by I-84 eastbound for two nights. Motorists will detour from I-84 to local roads, and back to I-84, via detours at both westbound and eastbound Exits 25, as follows:

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=601046

ConnDOT eAlert: Construction News from the Connecticut Department of Transportation

Public Information Meeting Concerning Proposed Intersection Improvements on Main Street (Route 35) in Ridgefield

The Connecticut Department of Transportation (Department) will conduct a public informational meeting concerning the proposed intersection improvements on Main Street (Route 25) on Thursday, March 22, 2018 in the Board of Education Conference Room, Town Hall Annex, 66 Prospect Street, Ridgefield, Connecticut 06877. An open forum for individual discussions with Department officials will begin at 6:30 p.m., followed by a design presentation at 7:00 p.m.

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=601044