New Overhead Electric Line to be Installed across Route 8 in Watertown; Helicopter to be Used
The Connecticut Department of Transportation is announcing that CL&P will be installing a new overhead electric line across Route 8 between exits 36 and 37 in Watertown on Saturday, March 22, 2014, between the hours of 1 p.m. and 4 p.m. A helicopter will be part of the operation.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=542014
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment