Thursday, October 31, 2013

ConnDOT eAlert: Construction News from the Connecticut Department of Transportation

Flower Street Pedestrian RR Crossing in Hartford to Close; Temporary Path will be Available

The pedestrian crossing over railroad tracks on Flower Street in Hartford will be closed as of Monday, November 11, 2013; however, pedestrians will still be able to use a temporary path that will be in place by the time of the closing. A permanent multi-use walkway is under construction and will be completed by Thanksgiving (November 28).

For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=534430

No comments:

Post a Comment