Wednesday, October 30, 2019

CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Nighttime Joint and Crack Sealing on Route 15 in Trumbull-Stratford and I-95 in Fairfield

The Connecticut Department of Transportation is announcing that a nighttime joint and crack sealing operation will continue on Route 15 Northbound/Southbound in Trumbull/Stratford and Interstate 95 Northbound in Fairfield through Friday, November 1, 2019. 

This project consists of joint and crack sealing a 2.37 mile segment of Route 15 Northbound/Southbound in Trumbull/Stratford and a 3.90 mile segment of Interstate 95 Northbound in Fairfield.

This work is being performed by Annseal Inc.

 

LANE CLOSURE INFO

Motorists can expect lane closures on Route 15 Northbound/Southbound from end overpass Route 8 to Exit 53 (Route 110) and Interstate 95 Northbound from the Westport Town Line to the begin overpass New England Avenue.  Traffic control patterns and crash units will be utilized to guide motorists through the work zone. The regular work schedule for this project is 8:00 p.m. to 5:00 a.m. (Sunday night through Friday morning).

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.


CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Joint and Crack Sealing along Route 77 in Guilford

The Connecticut Department of Transportation is announcing that a joint and crack sealing operation will continue on Route 77 in Guilford through Friday, November 1, 2019.

This project consists of joint and crack sealing 9.14 miles of Route 77 in Guilford.

 

This work is being performed by Annseal Inc.

 

LANE CLOSURE INFO

Motorists can expect lane closures on Route 77 in Guilford from Route 146 to the Durham Town Line.  Traffic control patterns and crash units will be utilized to guide motorists through the work zone. The regular work schedule for this project is 7:00 a.m. to 4:00 p.m. (Monday through Friday).

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.


CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Safety Improvements on Route 9 Southbound in Old Saybrook

The Connecticut Department of Transportation is announcing that a safety improvement project will be performed on Route 9 southbound in Old Saybrook, Wednesday and Thursday, November 6-7, 2019.

The project consists of installing guide rail and an impact attenuator system on Route 9 Southbound at Exit 2 in Old Saybrook.

This work is being performed by Total Fence LLC.

LANE CLOSURE INFO:

Motorists can expect a shoulder closure to occur at this location.  Two (2) crash attenuator vehicles and a signing pattern will be utilized to guide motorists through the work zone.  The regular work schedule for this project is from 7:00 a.m. to 4:00 p.m. (Wednesday – Thursday).

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.


Friday, October 18, 2019

CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Bridge Maintenance on Route 72 South in New Britain

The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Rte. 72 South in New Britain on Saturday, October 19, 2019. Work hours will be 7 a.m. to 3 p.m.

 

The project consists of bridge maintenance, overhead bridge repair, on Rt. 72 South, Bridge #4247 (High St. underpass), from Exit 8 to Exit 9 in New Britain. 

 

LANE CLOSURE INFO

Motorist can expect a left lane closure on Rte.72 South from Exit 8 to Exit 9 in New Britain.

Traffic control personnel, state police and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 7:00 a.m. to 3:00 p.m. (Saturday)

 

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.


CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Resurfacing on Route 68 - Church Street - in Wallingford

The Connecticut Department of Transportation is announcing that nighttime milling and resurfacing will be performed on Route 68 in Wallingford, Sunday, October 20, through Thursday, October 30, 2019.

The project consists of milling and resurfacing 5.15 miles of Route 68 in Wallingford. This project is being performed by the Eversource Gas Company under an encroachment permit.

 

LANE CLOSURE INFO

Motorists can expect lane closures to occur on Route 68 Eastbound between Chapel Street and the Durham Town Line. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The work schedule for this project is 7:00 p.m. to 5:00 a.m. for the milling and 8:00 a.m. to 4:00 p.m. for the resurfacing.

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.


CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Lane Closures for Bridge Inspections - October 20 - 26, 2019

Date

Time Allowed

Town

Lane Closure

Sunday, October 20, 2019

7:00 a.m. to 1:00 p.m.

Litchfield

Right lane closure on Route 8 NB between Exits 41 & 42.

Monday, October 21, 2019

9:00 a.m. to 3:00 p.m.

Meriden

Single and double lane closures on Route 15 Southbound at Exit 67W off-ramp

Monday, October 21, 2019

9:00 a.m. to 3:00 p.m.

Norwalk

Lane closures on CT Ave between
Van Buren Ave & West Ave

Monday, October 21, 2019

9:00 a.m. to 12:00 p.m. (NB) 11:00 a.m. to 2:00 p .m. (SB)

Stamford

Alternating right & left lane closures
on I-95 NB & SB, Exit 8-10

Monday, October 21, 2019

9:00 a.m. to 3:00 p.m.

Brookfield

Right lane closure on US Route 7 NB between US Route 202 & Exit 12.

Monday, October 21, 2019

9:00 a.m. to 2:00 p.m.

Hartford

(9:00AM - 2:00PM) Single right lane/shoulder closure on I-91 NB between Exits 34 & 35A (10:00AM - 2:00 PM) Single right lane/shoulder closure on I-91 SB between Exits 34 & 35A

Monday, October 21, 2019

9:00 a.m. to 3:00 p.m.

Killingly & Putnam

Alternating left and right lane closures and ramp lane shifts on I-395 NB & SB between exits 35 and 46

Tuesday, October 22, 2019

9:00 a.m. to 3:00 p.m.

Waterbury

Alternate right and left lane closure on Route 8 NB/SB between exits 29 & 30.

Tuesday, October 22, 2019

9:00 a.m. to 3:00 p.m.

New Haven

Alternate right lane closure on Route 162 between Ramps

Tuesday, October 22, 2019

9:00 a.m. to 3:00 p.m.

New Britain

Single lane closures on Route 9 Southbound near Exit 28

Tuesday, October 22, 2019

9:00 a.m. to 3:00 p.m.

Norwalk

Lane closures on Route 123 between
Riverside Ave. & Main St.

Tuesday, October 22, 2019

9:00 a.m. to 1:00 p .m. (EB) 10:00 a.m. to 2:00 p.m. (WB)

Brookfield and Newtown

Right lane closure on I-84 EB and left lane closure on I-84 WB between Exits 8 & 9.

Tuesday, October 22, 2019

9:00 a.m. to 1:00 p .m. (EB) 10:00 a.m. to 2:00 p.m. (WB)

Bethel

(Shared with ATANE)

Tuesday, October 22, 2019

9:00 a.m. to 3:00 p.m.

Waterbury

Right lane closure on Route 8 SB between Exits 36 and 34

Tuesday, October 22, 2019

9:00 a.m. to 3:00 p.m.

Hartford

Lane shifting on local rd. (Keney Park Rd.)

Tuesday, October 22, 2019

9:00 a.m. to 3:00 p.m.

Killingly & Putnam

Alternating left and right lane closures and ramp lane shifts on I-395 NB & SB between exits 35 and 46

Wednesday, October 23, 2019

9:00 a.m. to 3:00 p.m.

Old Saybrook

Alternate right and left lane closure on Route 9 SB between exits 2 and 1

Wednesday, October 23, 2019

10:00 p.m. to 5:00 a.m.

Milford

Double left lane closure and single right lane closure on I-95 SB between Exits 39 & 35.

Wednesday, October 23, 2019

8:30 a.m. to 4:30 p .m.

New Britain

Single lane closures on East Main St (Route 174) between Harry Truman Overpass and Stanley St

Wednesday, October 23, 2019

9:00 a.m. to 3:00 p.m.

Norwalk

Shoulder closures on US Route 7,
between I-95 & Exit 3.

Wednesday, October 23, 2019

9:00 a.m. to 3:00 p.m.

Shelton

Left lane closures on Route 8 NB & SB btwn Exits 14 & 15.

Wednesday, October 23, 2019

9:00 a.m. to 3:00 p.m.

Waterbury

Right lane closure on SR 846 (W. Main St) from Thomaston Ave to Riverside St.

Wednesday, October 23, 2019

9:00 a.m. to 3:00 p m.

Hartford

Alternating left and right lane closures on SR 598 WB

Wednesday, October 23, 2019

9:00 a.m. to 3:00 p.m.

Killingly & Putnam

Alternating left and right lane closures and ramp lane shifts on I-395 NB & SB between exits 35 and 46

Wednesday, October 23, 2019

8:00 p.m. to 5:00 a.m.

Hartford

Double Left or Right lane closures and ramp lane shifts on I-84 WB between exits 48 and 53

Thursday, October 24, 2019

11:00 p.m. to 5:00 a.m.

New Haven

Double left and double right lane closures from I-95 to Exit 5

Thursday, October 24, 2019

9:00 a.m. to 3:00 p.m.

Bridgeport

Alternating right & left lane closures
on RT 8 NB & SB, Exit 4-6

Thursday, October 24, 2019

9:00 a.m. to 2:00 p m.

Waterbury

Shoulder closure/lane shift on Bank Street btwn Meadow Street & I-84 WB on ramp.

Thursday, October 24, 2019

8:00 p.m. to 5:00 a.m.

Hartford

Double Left or Right lane closures and ramp lane shifts on I-84 WB between exits 48 and 53

Friday, October 25, 2019

9:00 a.m. to 3:00 p.m.

Bridgeport

Alternating right & left lane closures
on RT 8 NB & SB, Exit 4-6

Saturday, October 26, 2019

6:30 a.m. to 1:00 p.m.

New Haven

Alternate double left lane closure on I-91 SB between exits 3 & 1