Thursday, August 29, 2019

CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Railroad Crossing Repairs on East Main Street in Plainville

The Connecticut Department of Transportation is announcing that railroad crossing repairs will be performed on the Route 372 (East Main Street) crossing in Plainville, overnight Sunday-Monday,       September 8-9, 2019.

 

The railroad crossing repairs will be performed on Route 372 (East Main Street) at Pine Street in Plainville, which will require the road to be closed.  The upgrade includes replacement of the crossing riding surface.

 

This work is being performed by Pan Am Railroad in cooperation with the Department of Transportation.

 

LANE CLOSURE INFO

Route 372 eastbound motorists will be detoured east onto Pine Street, north onto Route 10 (East Street) back to Route 372.  Route 372 westbound motorists will be detoured south onto Route 10 (East Street), west onto Pine Street back to Route 372.  Traffic control personnel, police and signing patterns will be utilized to guide motorists through the detour.

 

*The detour is scheduled to be in place from 12:01 midnight Sunday, September 8, 2019 to 5:00 a.m. on Monday, September 9, 2019, unless the work is completed sooner. *

 

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.



CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Pedestrian Upgrades along East Street in New Britain

The Connecticut Department of Transportation is announcing that pedestrian upgrades will be performed on Route 174 (East Street) in New Britain, Tuesday, September 10, through Friday, September 13, 2019. 

 

The pedestrian upgrades consist of updating ADA ramps, crosswalk buttons, and pavement markings on Route 174 at the intersections of Newington Avenue and East Main Street in New Britain.

 

LANE CLOSURE INFO

Motorists can expect intermittent lane closures to occur on Route 174 (East St.) at the intersections of Newington Avenue and East Main Street. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 8:00 a.m. to 4:00 p.m. (weekdays). 

 

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.

 



CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Nighttime Bridge Maintenance along I-95 in Milford

The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-95 North and South in Milford, Wednesday, September 11, through Friday, October 11, 2019.

 

The project consists of concrete deck end repairs and asphaltic plug joint installation on the I-95 North and South Bridge #00137 (Metro-North overpass) in Milford.

 

The work is included in the Department of Transportation's 2019 bridge maintenance program to support state forces with bridge repairs being performed by Hammonasset Construction and Dynamic Surface Applications, LTD.

 

LANE CLOSURE INFO

Motorists can expect lane closures on I-95 North and South between Exit 33 (Ferry Blvd.) and Exit 36 (Plains Rd.) in Milford.  Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 8:00 p.m. to 5:00 a.m.  (Monday through Thursday evenings).

    

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.


Tuesday, August 27, 2019

CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Nighttime Bridge Maintenance along Interstate 95 in Milford

The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on Interstate 95 North and South in Milford, Wednesday, September 4, through Friday, September 20, 2019.

The project consists of structural steel repairs to the West River Street Bridge (#00144) over   Interstate 95. 

 

This project is included in the Department of Transportation's 2019 bridge maintenance program to support state forces with bridge repairs and is being performed by Hammonasset Construction.

 

LANE CLOSURE INFO

Motorists can expect lane closures on Interstate 95 North and South between Exit 37 (High Street) and Exit 39A (Route 1 South) in Milford.  Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 8:00 p.m. to 5:00 a.m. (Monday through Thursday evenings).

 

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.


CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Nighttime Resurfacing Project on Route 44 (Winsted-Norfolk Road) in Winchester

The Connecticut Department of Transportation is announcing that a nighttime resurfacing project will be performed on a 2.15-mile section of Route 44 in Winchester, Thursday, August 29, through Friday, September 20, 2019. No work will be performed over the Labor Day weekend.     

The project consists of milling and resurfacing Route 44 from Route 183 (East Junction) to Route 183 (West Junction.)

LANE CLOSURE INFO

Motorists can expect delays and one lane alternating Traffic.  Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 7 p.m. to 5:00 a.m. (Sunday through Thursday).

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.


CTDOT eAlert: Construction News

Web Version    
DOT Seal
Connecticut
Department of Transportation

Resurfacing Project on Route 159 in Suffield

The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on a 3.94-mile segment of Route 159 in Suffield, Monday, August 26, through Friday, September 6, 2019.     

 

LANE CLOSURE INFO

Motorists can expect delays and one lane alternating traffic.  Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.

The regular work schedule for Milling this project is 7:00 p.m. to 5:00 a.m. (Monday through Wednesday) 8/26/19 to 8/28/19.

The regular work schedule for Paving this project is 7:00 a.m. to 4:00 p.m. (Monday through Friday) 8/26/19 to 8/30/19.

* The second week of paving will be scheduled night work 9/3/19 to 9/6/19. Scheduled hours of day work will be 7:00 p.m. to 5:00 a.m. (Tuesday through Friday).

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.  Motorists are advised to maintain a safe speed when driving in this vicinity.