Friday, April 24, 2020

CTDOT eAlert: Construction News from CTDOT

Web Version    
DOT Seal
Connecticut
Department of Transportation

Lane Closures for Bridge Inspections - April 27 - May1

Date

Time Allowed

Town

Lane Closure

Monday, April 27, 2020

9:00AM-3:00PM

Berlin; Meriden; Wallingford

Right shoulder closures Route 9 NB between Exits 22 and 24 and Route 9 SB between Exits 25 and 23. Right shoulder closures on I-691 SB between Exits 7 and 6 and I-691 NB between Exits 7 and 8. Shoulder closures on Route 15 SB on-ramp from Route 5 (North Colony Road) and Route 15 NB between Exits 65 and 66.

Monday, April 27, 2020

9:00AM-3:00PM

Norwich

Lane shifting on local road (Wawecus Street) between Otrobando Avenue and Browing Street.

Monday, April 27, 2020

9:00AM-3:00PM

Farmington

Alternating single and double lane closures on I-84 between Exits 37 and 39.

Monday, April 27, 2020

9:00AM-3:00PM (single) and 9:00AM-12:00PM (NB - double), 10:00AM- 1:00PM (SB - double)

Enfield

Alternating double left and right lane closures and ramp lane shifts on I-91 NB and SB between exit 46 and 49.

Monday, April 27, 2020

9:00AM-3:00PM

Norwalk

Alternating right and left lane closures on I-95 NB and SB, Exit 14-17.

Tuesday, April 28, 2020

9:00AM-2:00PM

Waterbury

Right lane closures on I-84 between Exits 17 & 20.

Tuesday, April 28, 2020

9:00AM-3:00PM

New Haven

Right shoulder closure/Lane shifting on I-91 SB on-ramp from State Street and Right shoulder closure/Lane shifting on I-91 SB off-ramp at Exit 3.

Tuesday, April 28, 2020

9:00AM-3:00PM

Farmington

Alternating single and double lane closures on I-84 between Exits 37 and 39.

Tuesday, April 28, 2020

9:00AM-2:00PM (NB) and 10:00AM-2:00PM (SB)

Windsor

Alternating double left and right lane closures and HOV lane shifts on I-91 NB and SB between exits 33 and 36.

Tuesday, April 28, 2020

9:00AM-3:00PM

Norwalk

Alternating right and left lane closures on I-95 NB and SB, Exit 14-17.

Wednesday, April 29, 2020

9:00AM-2:00PM (NB) and 10:00AM-2:00PM (SB)

Windsor

Alternating double left and right lane closures and HOV lane shifts on I-91 NB and SB between exits 33 and 36.

Wednesday, April 29, 2020

9:00AM-3:00PM

Norwalk

Alternating right and left lane closures on I-95 NB and SB, Exit 14-17.

Wednesday, April 29, 2020

9:00AM-3:00PM

Greenwich

Alternating right and left lane closures on I-95 NB and SB, NY State Line to Exit 3.

Thursday, April 30, 2020

9:00AM-3:00PM

Norwalk

Alternating right and left lane closures on I-95 NB and SB, Exit 14-17.

Thursday, April 30, 2020

9:00AM-3:00PM

Greenwich

Alternating right and left lane closures on I-95 NB and SB, NY State Line to Exit 3.

Friday, May 1, 2020

9:00AM-3:00PM

Essex

Alternate right shoulder/lane shift on Route 153 between Ramps.

Friday, May 1, 2020

9:00AM-3:00PM

Meriden

Shoulder closures / lane shifts on Bunker Avenue between Camp Street and Warren Street.

Friday, May 1, 2020

9:00AM-3:00PM

Windsor

Local lane shifts and shoulder closures on Briarwood Drive.

Friday, May 1, 2020

9:00AM-3:00PM

Bridgeport

Shoulder closures on
I-95 NB and SB, Exit 26-30.

 


No comments:

Post a Comment