Nighttime Bridge Maintenance on I-95 in Branford
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-95 in Branford beginning Monday, January 5, 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558716
Wednesday, December 31, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Bridge Maintenance on I-95 in Westport
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-95 in Westport, northbound and southbound, beginning Wednesday, January 7, 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558714
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-95 in Westport, northbound and southbound, beginning Wednesday, January 7, 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558714
Tuesday, December 23, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Rehabilitation of Bridge No.01615, SR555 (West Main Street over Pan Am Southern Railroad) in New Britain
The Connecticut Department of Transportation is announcing the rehabilitation of Bridge No. 01615 in New Britain, with work commencing on January 30, 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558496
The Connecticut Department of Transportation is announcing the rehabilitation of Bridge No. 01615 in New Britain, with work commencing on January 30, 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558496
Friday, December 19, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
'Speed Change' Lanes Open on I-95 Northbound in Norwalk
The Connecticut Department of Transportation (CTDOT) today announced the opening – five months ahead of schedule – of new "speed change" lanes on I-95 northbound in Norwalk, designed to enhance traffic safety and ease congestion on this heavily used section of the Connecticut turnpike.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558376
The Connecticut Department of Transportation (CTDOT) today announced the opening – five months ahead of schedule – of new "speed change" lanes on I-95 northbound in Norwalk, designed to enhance traffic safety and ease congestion on this heavily used section of the Connecticut turnpike.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558376
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Survey Work Requires Daytime Lane Closures on Merritt Parkway, Greenwich
The Connecticut Department of Transportation is announcing that the CONNDOT Maintenance forces plan to close lanes on Route 15 in Greenwich in the vicinity of Riversville road for survey operations from approximately 10:00am to 2:00pm on Monday, December 22, 2014, weather permitting.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558374
The Connecticut Department of Transportation is announcing that the CONNDOT Maintenance forces plan to close lanes on Route 15 in Greenwich in the vicinity of Riversville road for survey operations from approximately 10:00am to 2:00pm on Monday, December 22, 2014, weather permitting.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558374
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Construction and Maintenance Activities Restricted on Major Expressways for Upcoming Holidays
The Connecticut Department of Transportation is announcing that there will be no maintenance or construction activities on major expressways for the Christmas and New Year holiday periods. Only work of an emergency nature will be considered.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558366
The Connecticut Department of Transportation is announcing that there will be no maintenance or construction activities on major expressways for the Christmas and New Year holiday periods. Only work of an emergency nature will be considered.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558366
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections, December 22-23, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, December 22-23, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558350
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, December 22-23, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=558350
ConnDOT eAlert: News from the Connecticut Department of Transportation
One Percent Rail Fare Increase Takes Effect January 1, 2015
The Connecticut Department of Transportation is reminding passengers that train fares on the New Haven Line and Shore Line East will go up 1 percent on January 1, 2015. Monthly tickets on sale for January now reflect the new fares.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=558318
The Connecticut Department of Transportation is reminding passengers that train fares on the New Haven Line and Shore Line East will go up 1 percent on January 1, 2015. Monthly tickets on sale for January now reflect the new fares.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=558318
Friday, December 12, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
New I-95 Southbound Exit 14 Reopening in New Configuration on Thursday, December 18, 2014
The Connecticut Department of Transportation is continuing the improvements of Interstate 95 and Route 1 in Norwalk. As part of the work, the southbound Exit 14 off-ramp will be reopened as a two lane exit with increased capacity for traffic entering US Route 1 on Thursday morning, December 18, 2014, weather permitting.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557922
The Connecticut Department of Transportation is continuing the improvements of Interstate 95 and Route 1 in Norwalk. As part of the work, the southbound Exit 14 off-ramp will be reopened as a two lane exit with increased capacity for traffic entering US Route 1 on Thursday morning, December 18, 2014, weather permitting.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557922
Tuesday, December 9, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Detour Required for Weekend Bridge Inspection on I-84 Westbound in Waterbury
The Connecticut Department of Transportation announced today that a detour will be required on I-84 Westbound in Waterbury next month during a bridge inspection. Exit 19 to Route 8 Southbound will be closed from 6 a.m. until 2 p.m. on Saturday, January 10, 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557776
The Connecticut Department of Transportation announced today that a detour will be required on I-84 Westbound in Waterbury next month during a bridge inspection. Exit 19 to Route 8 Southbound will be closed from 6 a.m. until 2 p.m. on Saturday, January 10, 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557776
Monday, December 8, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Safety Improvement Project along Route 5 and Route 372
The Connecticut Department of Transportation is announcing that a guiderail safety improvement project will be performed on Route 5, (Broad Street) Northbound and Southbound in Meriden and Route 372 in Berlin, December 8-22, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557706
The Connecticut Department of Transportation is announcing that a guiderail safety improvement project will be performed on Route 5, (Broad Street) Northbound and Southbound in Meriden and Route 372 in Berlin, December 8-22, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557706
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Traffic Loop Installations along Route in Middletown/Cromwell.
The Connecticut Department of Transportation is announcing that a nighttime traffic loop installation project will be performed on Route 9 Northbound and Southbound in Middletown and Cromwell, December 11-18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557704
The Connecticut Department of Transportation is announcing that a nighttime traffic loop installation project will be performed on Route 9 Northbound and Southbound in Middletown and Cromwell, December 11-18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557704
Wednesday, December 3, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Traffic Sensor Installations on I-84 at Bulkeley Bridge in East Hartford.
The Connecticut Department of Transportation is announcing that a nighttime traffic sensor and loop installation project will continue on I-84 Eastbound and Westbound at the Bulkeley Bridge in East Hartford through the morning of Thursday, December 11, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557490
The Connecticut Department of Transportation is announcing that a nighttime traffic sensor and loop installation project will continue on I-84 Eastbound and Westbound at the Bulkeley Bridge in East Hartford through the morning of Thursday, December 11, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557490
Monday, December 1, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections, December 2-7, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, December 2-7, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557372
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, December 2-7, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557372
Friday, November 28, 2014
ConnDOT eAlert: News from the Connecticut Department of Transportation
Public Information Meeting Regarding Windham Airport Master Plan
The Connecticut Department of Transportation (Department) and the Connecticut Airport Authority will conduct a second public information meeting concerning Windham Airport Master Plan.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=557244
The Connecticut Department of Transportation (Department) and the Connecticut Airport Authority will conduct a second public information meeting concerning Windham Airport Master Plan.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=557244
Wednesday, November 26, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Water Main Repair along Thomaston Avenue in Waterbury
The Connecticut Department of Transportation is announcing repairs to a 30-inch water main in the southbound lane of Thomaston Avenue (S.R. 847) 400 feet south of Homer Street in Waterbury, December 1-3, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557206
The Connecticut Department of Transportation is announcing repairs to a 30-inch water main in the southbound lane of Thomaston Avenue (S.R. 847) 400 feet south of Homer Street in Waterbury, December 1-3, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557206
Tuesday, November 25, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Bridge Maintenance on I-84 in Southington, Route 72 in New Britain, Route 9 Northbound in Cromwell
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-84 Eastbound & Westbound in Southington, Route 72 Northbound and Southbound and Ramps in New Britain & Route 9 Northbound in Cromwell.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557174
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-84 Eastbound & Westbound in Southington, Route 72 Northbound and Southbound and Ramps in New Britain & Route 9 Northbound in Cromwell.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557174
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Safety Improvement Projects in Brooklyn, Killingly, Essex, Chester, Old Saybrook and Clinton
The Connecticut Department of Transportation is announcing that a safety attenuator installation projects will be performed on Rt. 6 in Brooklyn & Killingly, Rt. 9 in Essex & Chester, Rt. 2 in Bozrah, and I-95 in Old Saybrook & Clinton – Thursday, December 4 through Friday, December 12, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557172
The Connecticut Department of Transportation is announcing that a safety attenuator installation projects will be performed on Rt. 6 in Brooklyn & Killingly, Rt. 9 in Essex & Chester, Rt. 2 in Bozrah, and I-95 in Old Saybrook & Clinton – Thursday, December 4 through Friday, December 12, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557172
Friday, November 21, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Bridge Maintenance on I-95 in Norwalk
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-95 Northbound & Southbound in Norwalk through the morning of Tuesday, December 9, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557044
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-95 Northbound & Southbound in Norwalk through the morning of Tuesday, December 9, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557044
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Emergency Utility Work on Route 17 (Hartford Avenue) at Route 66 (Main Street) in Middletown
The Connecticut Department of Transportation is announcing that emergency utility work will be performed on Route 17 (Hartford Avenue) at Route 66 (Main Street) in Middletown on Saturday, November 22, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557042
The Connecticut Department of Transportation is announcing that emergency utility work will be performed on Route 17 (Hartford Avenue) at Route 66 (Main Street) in Middletown on Saturday, November 22, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557042
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Traffic Sensor Loop Installation on I-84 in East Hartford
The Connecticut Department of Transportation is announcing that a nighttime traffic loop installation project will continue on I-84 Eastbound and Westbound in East Hartford through the morning of Tuesday, November 25, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557040
The Connecticut Department of Transportation is announcing that a nighttime traffic loop installation project will continue on I-84 Eastbound and Westbound in East Hartford through the morning of Tuesday, November 25, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=557040
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Expect Morning Traffic Impacts Sunday, November 23, 2014 due to a 10 Minute Traffic Stoppage on I-95 Northbound and Southbound on the Pearl Harbor Memorial (Q) Bridge and Forbes Avenue (Route 1) in New Haven.
The Connecticut Department of Transportation (CTDOT) is announcing that construction activities related to construction of the new Southbound Q Bridge are expected to cause delays throughout the I-95 New Haven Corridor the morning of Sunday, November 23, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556982
The Connecticut Department of Transportation (CTDOT) is announcing that construction activities related to construction of the new Southbound Q Bridge are expected to cause delays throughout the I-95 New Haven Corridor the morning of Sunday, November 23, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556982
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections, November 24-26, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, November 24-26, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556980
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, November 24-26, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556980
Monday, November 17, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Notification of Lane Closures for Nighttime Survey Work on I-95 at Exit 9 Northbound in Stamford
The Connecticut Department of Transportation is announcing that there will be a short-term traffic shift along I-95 Northbound from the Exit 9 off-ramp to the Hamilton Avenue underpass for Route 1/East Main Street over I-95 on Tuesday, November 18, 2014. This operation will be weather dependent.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556676
The Connecticut Department of Transportation is announcing that there will be a short-term traffic shift along I-95 Northbound from the Exit 9 off-ramp to the Hamilton Avenue underpass for Route 1/East Main Street over I-95 on Tuesday, November 18, 2014. This operation will be weather dependent.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556676
Friday, November 14, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Highway Lighting Maintenance on I-84 Eastbound, in Newtown, Southbury and Waterbury
The Connecticut Department of Transportation is announcing the maintenance of highway lighting on I-84 Eastbound from Exit 10 to Exit 18 in Newtown, Southbury and Waterbury on Saturday, November 15, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556644
The Connecticut Department of Transportation is announcing the maintenance of highway lighting on I-84 Eastbound from Exit 10 to Exit 18 in Newtown, Southbury and Waterbury on Saturday, November 15, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556644
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Traffic Sensor Installation I-84 Eastbound and Westbound in East Hartford
The Connecticut Department of Transportation is announcing that a nighttime traffic loop installation project will be performed on I-84 Eastbound and Westbound in East Hartford beginning Tuesday, November 18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556646
The Connecticut Department of Transportation is announcing that a nighttime traffic loop installation project will be performed on I-84 Eastbound and Westbound in East Hartford beginning Tuesday, November 18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556646
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Safety Improvement Project along Route 14A in Plainfield
The Connecticut Department of Transportation is announcing that a safety improvement project will be performed along Route 14A in Plainfield, November 19 through December 3, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556642
The Connecticut Department of Transportation is announcing that a safety improvement project will be performed along Route 14A in Plainfield, November 19 through December 3, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556642
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Maintenance on Yellow Mill Channel Overpass in Bridgeport
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Route 130 on the Yellow Mill Channel Overpass in Bridgeport, November 18-25, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556588
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Route 130 on the Yellow Mill Channel Overpass in Bridgeport, November 18-25, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556588
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Closure Schedule of East River Drive Ramp for Bridge Joint Repair on Route 15 Southbound over the Connecticut River – the Charter Oak Bridge in East Hartford
The Connecticut Department of Transportation is announcing that the East River Drive On Ramp is scheduled to be closed between the hours of 4 pm and 7 am from Monday, November 17 through Wednesday, November 19, 2014, to work on the approach to Charter Oak Bridge, Route 15 southbound over the Connecticut River.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556580
The Connecticut Department of Transportation is announcing that the East River Drive On Ramp is scheduled to be closed between the hours of 4 pm and 7 am from Monday, November 17 through Wednesday, November 19, 2014, to work on the approach to Charter Oak Bridge, Route 15 southbound over the Connecticut River.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556580
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections, November 17-21, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, November 17-21, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556578
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, November 17-21, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556578
Thursday, November 13, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Motorist Advisory - Short Term Nighttime Closure of Interstate 84 in Both Directions at Exit 23, Hamilton Avenue, in Waterbury Scheduled for Saturday, November 15, 2014
The Connecticut Department of Transportation is announcing that on early Saturday morning, November 15, 2014 from 3 AM to 4 AM, I-84 will be closed for approximately one hour in both directions at Exit 23 Hamilton Avenue for relocation of overhead power lines.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556564
The Connecticut Department of Transportation is announcing that on early Saturday morning, November 15, 2014 from 3 AM to 4 AM, I-84 will be closed for approximately one hour in both directions at Exit 23 Hamilton Avenue for relocation of overhead power lines.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556564
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane and Ramp Closure Schedule for Rehabilitation of Bridge over Interstate 84, US Route 7 and Beaver Brook in Danbury
The Connecticut Department of Transportation is announcing that on November 14, 2014, activity for the painting of the structure carrying the Route 7 southbound Exit 10 ramp to I-84 EB located in Danbury will begin. The work is expected to continue over the winter months.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556562
The Connecticut Department of Transportation is announcing that on November 14, 2014, activity for the painting of the structure carrying the Route 7 southbound Exit 10 ramp to I-84 EB located in Danbury will begin. The work is expected to continue over the winter months.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556562
Wednesday, November 12, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Overnight Traffic Impacts Thursday, November 20, in New Haven; I-95 Northbound off-ramp to I-91 Northbound (Exit 48) to be Closed
The Connecticut Department of Transportation (CTDOT) is announcing that construction activities related to roadway construction are expected to cause delays throughout the I-95 New Haven Corridor during the overnight of Thursday, November 20, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556524
The Connecticut Department of Transportation (CTDOT) is announcing that construction activities related to roadway construction are expected to cause delays throughout the I-95 New Haven Corridor during the overnight of Thursday, November 20, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556524
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Intersection Improvements in East Hampton
The Connecticut Department of Transportation is announcing that intersection improvements on Routes 66 and 196 and Old Marlborough Road in East Hampton will begin November 14, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556482
The Connecticut Department of Transportation is announcing that intersection improvements on Routes 66 and 196 and Old Marlborough Road in East Hampton will begin November 14, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556482
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Traffic Sensor Installations along Route 2 in East Hartford
The Connecticut Department of Transportation is announcing that a nighttime traffic sensor installation project will be performed on Route 2 at the Maple Street ramps in East Hartford beginning Wednesday evening, November 12, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556480
The Connecticut Department of Transportation is announcing that a nighttime traffic sensor installation project will be performed on Route 2 at the Maple Street ramps in East Hartford beginning Wednesday evening, November 12, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556480
Friday, November 7, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Safety Improvements on Route 195 in Tolland
The Connecticut Department of Transportation is announcing that a guiderail safety improvement project will continue on Route 195 in Tolland through Friday, November 14, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556396
The Connecticut Department of Transportation is announcing that a guiderail safety improvement project will continue on Route 195 in Tolland through Friday, November 14, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556396
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Maintenance on Route 165, Broad Brook Overpass, in Preston
The Connecticut Department of Transportation is announcing that bridge maintenance will be performed on Route 165, Broad Brook overpass, in Preston – 7 a.m. to 5 p.m. on Saturday, November 8, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556394
The Connecticut Department of Transportation is announcing that bridge maintenance will be performed on Route 165, Broad Brook overpass, in Preston – 7 a.m. to 5 p.m. on Saturday, November 8, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556394
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Resurfacing Merritt Parkway (Route 15) Southbound Exit 47 Off Ramp in Trumbull
The Connecticut Department of Transportation is announcing that a resurfacing project will occur on Route 15 Southbound, Exit 47 Off Ramp (Park Avenue) in Trumbull on Sunday, November 9, 2014 and will require the ramp to be closed with a detour.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556392
The Connecticut Department of Transportation is announcing that a resurfacing project will occur on Route 15 Southbound, Exit 47 Off Ramp (Park Avenue) in Trumbull on Sunday, November 9, 2014 and will require the ramp to be closed with a detour.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556392
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Traffic Sensor Installation on I-384 in Bolton
The Connecticut Department of Transportation is announcing that a nighttime traffic sensor installation project will be performed on I-384 eastbound and westbound in Bolton beginning Sunday, November 9, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556390
The Connecticut Department of Transportation is announcing that a nighttime traffic sensor installation project will be performed on I-384 eastbound and westbound in Bolton beginning Sunday, November 9, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556390
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Temporary Closure of Route 79 (Durham Road) in Madison
The Connecticut Department of Transportation is announcing that Route 79, Durham Road, will be closed to traffic between Bradley Road and Woodland Road/Old Route 79 in Madison starting Friday night November 14, 2014. The closure is expected to continue until completion of the project on or about November 18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556384
The Connecticut Department of Transportation is announcing that Route 79, Durham Road, will be closed to traffic between Bradley Road and Woodland Road/Old Route 79 in Madison starting Friday night November 14, 2014. The closure is expected to continue until completion of the project on or about November 18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556384
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections November 8-14, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, November 8-14, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556364
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, November 8-14, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556364
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Short Term Nighttime Closure of Interstate 84 in Both Directions at Exit 23, Hamilton Avenue, in Waterbury on November 15, 2014
The Connecticut Department of Transportation is announcing that on early Saturday morning, November 15, 2014, sometime between the hours of 3 AM and 5 AM, I-84 will be closed for approximately one hour in both directions at Exit 23 (Hamilton Avenue) for relocation of overhead power lines.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556352
The Connecticut Department of Transportation is announcing that on early Saturday morning, November 15, 2014, sometime between the hours of 3 AM and 5 AM, I-84 will be closed for approximately one hour in both directions at Exit 23 (Hamilton Avenue) for relocation of overhead power lines.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556352
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Survey Work on I-95 in Stamford; Lane Closures Required
The Connecticut Department of Transportation is announcing nighttime lane closures to perform surveying for the Route 1 (East Main Street) bridge over I-95 in Stamford starting on Thursday, November 13, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556348
The Connecticut Department of Transportation is announcing nighttime lane closures to perform surveying for the Route 1 (East Main Street) bridge over I-95 in Stamford starting on Thursday, November 13, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556348
Tuesday, November 4, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Bridge Maintenance on Route 8 in Bridgeport; Lane Closures Required
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on Route 8 in Bridgeport, November 9-21, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556148
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on Route 8 in Bridgeport, November 9-21, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=556148
Friday, October 31, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections November 1 – 7, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, November 1-7, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555978
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, November 1-7, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555978
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Traffic Sensor Installations, I-84 Eastbound Manchester
The Traffic loop installation project will be performed on I-84 Eastbound at Slater Road Overpass in Manchester. This project is scheduled to occur from 7:00 p.m. to 5:00 a.m. Monday, November 3, 2014, to the morning of Friday November 7, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555964
The Traffic loop installation project will be performed on I-84 Eastbound at Slater Road Overpass in Manchester. This project is scheduled to occur from 7:00 p.m. to 5:00 a.m. Monday, November 3, 2014, to the morning of Friday November 7, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555964
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Railroad Crossing Repairs on Route 12 in Plainfield The railroad crossing repairs will require Route 12 (Putnam Road) in Plainfield to be closed for three consecutive days beginning on Tuesday, November 11, 2014, through Thursday, November 13, 2014. This work is being performed by Providence-Worcester Railroad. For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555958
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Construction Update for the Replacement of the West River Bridge (I-95) in New Haven and West Haven
The Connecticut Department of Transportation is announcing that a new on-ramp configuration to I-95 Northbound at the Exit 45 Interchange is scheduled for Friday, November 14, 2014, followed by a major traffic shift on I-95 Northbound on Friday, November 21, 2014, through Monday morning, November 23, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555950
The Connecticut Department of Transportation is announcing that a new on-ramp configuration to I-95 Northbound at the Exit 45 Interchange is scheduled for Friday, November 14, 2014, followed by a major traffic shift on I-95 Northbound on Friday, November 21, 2014, through Monday morning, November 23, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555950
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Replacement of Bridge No. 01109, Route 72 over Marsh Brook in the Town of Plymouth
The Connecticut Department of Transportation is announcing that Route 72 over Marsh Brook in Plymouth will be closed on November 3, 2014 for work related to the Replacement of Bridge No. 01109.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555946
The Connecticut Department of Transportation is announcing that Route 72 over Marsh Brook in Plymouth will be closed on November 3, 2014 for work related to the Replacement of Bridge No. 01109.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555946
Wednesday, October 29, 2014
ConnDOT eAlert: News from the Connecticut Department of Transportation
Credit Cards Now Accepted on Danbury Branch Rail Line
The Connecticut Department of Transportation (DOT) today announced that commuters on the Danbury Branch of the New Haven rail line may now use credit cards to purchase tickets on board the train. It is part of a pilot project before opening up the entire New Haven Line to credit card usage next year.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=555850
The Connecticut Department of Transportation (DOT) today announced that commuters on the Danbury Branch of the New Haven rail line may now use credit cards to purchase tickets on board the train. It is part of a pilot project before opening up the entire New Haven Line to credit card usage next year.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=555850
ConnDOT eAlert: News from the Connecticut Department of Transportation
Stratford Railroad Station Parking Lot Expansion
The first section of the reconstructed parking lot at the Stratford railroad station has been completed and is now open, providing 145 spaces. The remaining sections of the lot will open in the spring of 2015 and will provide a total of 309 spaces, compared with 122 today.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=555830
The first section of the reconstructed parking lot at the Stratford railroad station has been completed and is now open, providing 145 spaces. The remaining sections of the lot will open in the spring of 2015 and will provide a total of 309 spaces, compared with 122 today.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=555830
Tuesday, October 28, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Closure and traffic Detour on Southbound US Rt.1 (East Main Street) and Eastbound Ferry Blvd. in Stratford
The Connecticut Department of Transportation is announcing the closure and detour of traffic on southbound US Rt. 1(East Main Street) and eastbound Ferry Blvd. in Stratford during overnight hours October 30, November 4, and November 6, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555782
The Connecticut Department of Transportation is announcing the closure and detour of traffic on southbound US Rt. 1(East Main Street) and eastbound Ferry Blvd. in Stratford during overnight hours October 30, November 4, and November 6, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555782
Monday, October 27, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Closures of the I-95 southbound Exit 14 Off-Ramp in Norwalk Beginning November 3, 2014
The Connecticut Department of Transportation is announcing the nighttime closure of the I-95 southbound Exit 14 off-ramp in Norwalk for two weeks from 9:00pm until 6:00 am beginning Monday, November 3, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555710
The Connecticut Department of Transportation is announcing the nighttime closure of the I-95 southbound Exit 14 off-ramp in Norwalk for two weeks from 9:00pm until 6:00 am beginning Monday, November 3, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555710
Friday, October 24, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Plans Under Development for Mid-block Crosswalks on Route 137 (Washington Boulevard) between Tresser Boulevard and Broad Street in Stamford
The Connecticut Department of Transportation's Office of Engineering is developing plans to provide pedestrian access between the east and west sides of Route 137 by installing High-intensity Activated crossWalK beacon (HAWK) systems at two separate locations. An existing crosswalk located on Route 137, just south of Bell Street, would be upgraded and the existing traffic signal would be replaced with the HAWK system. A new pedestrian crosswalk with the HAWK system is also being proposed on Route 137 for access between the Mill River Park on the west side and parking garages on the east side of the roadway.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555638
The Connecticut Department of Transportation's Office of Engineering is developing plans to provide pedestrian access between the east and west sides of Route 137 by installing High-intensity Activated crossWalK beacon (HAWK) systems at two separate locations. An existing crosswalk located on Route 137, just south of Bell Street, would be upgraded and the existing traffic signal would be replaced with the HAWK system. A new pedestrian crosswalk with the HAWK system is also being proposed on Route 137 for access between the Mill River Park on the west side and parking garages on the east side of the roadway.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555638
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Traffic Shift Scheduled as work continues on the bridge carrying Interstate 84 Westbound over Center Street in Newtown
The Connecticut Department of Transportation is announcing that traffic will be shifted on Interstate 84 to rehabilitate Bridge No. 04256 over Center Street in Newtown. The traffic shift on Interstate 84 WB is scheduled for Wednesday night, October 29, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555630
The Connecticut Department of Transportation is announcing that traffic will be shifted on Interstate 84 to rehabilitate Bridge No. 04256 over Center Street in Newtown. The traffic shift on Interstate 84 WB is scheduled for Wednesday night, October 29, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555630
Thursday, October 23, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
MOTORIST ADVISORY - Expect Weekend Traffic Impacts Friday, October 24 through the evening of Sunday, October 26, 2014 on the I-91 Southbound off-ramp to I-95 Northbound and the Wooster Street on-ramp to I-95 Northbound to facilitate bridge work
The Connecticut Department of Transportation is announcing that activities related to bridge construction are expected to cause delays throughout the I-95 New Haven Corridor the weekend of Friday, October 24 through the evening of Sunday, October 26, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555546
The Connecticut Department of Transportation is announcing that activities related to bridge construction are expected to cause delays throughout the I-95 New Haven Corridor the weekend of Friday, October 24 through the evening of Sunday, October 26, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555546
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Norwich Avenue Bridge Work Completed in Lebanon; Detours Removed
The Connecticut Department of Transportation is announcing that the work for the replacement of the Norwich Avenue bridge over Bartlett Brook in Lebanon has substantially been completed and all roads previously closed for the detour of traffic will be opened to traffic on October 25, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555542
The Connecticut Department of Transportation is announcing that the work for the replacement of the Norwich Avenue bridge over Bartlett Brook in Lebanon has substantially been completed and all roads previously closed for the detour of traffic will be opened to traffic on October 25, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555542
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Survey Work along I-95 in Stamford; Lane Closures Required
The Connecticut Department of Transportation is announcing nighttime lane closures to perform surveying for a bridge replacement project in Stamford beginning Wednesday, October 28, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555540
The Connecticut Department of Transportation is announcing nighttime lane closures to perform surveying for a bridge replacement project in Stamford beginning Wednesday, October 28, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555540
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Installation of Traffic Signals in Eastern Connecticut
The Connecticut Department of Transportation is announcing that a project for the installation and revisions of traffic signals in 15 eastern Connecticut towns will begin in April 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555532
The Connecticut Department of Transportation is announcing that a project for the installation and revisions of traffic signals in 15 eastern Connecticut towns will begin in April 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555532
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Tree Removal along Merritt Parkway in Fairfield
The Connecticut Department of Transportation is announcing that a tree removal operation will be performed on Route 15 Northbound in Fairfield, October 27 through November 7, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555526
The Connecticut Department of Transportation is announcing that a tree removal operation will be performed on Route 15 Northbound in Fairfield, October 27 through November 7, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555526
Wednesday, October 22, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bids Opened for I-84 Widening Project in Waterbury
The Connecticut Department of Transportation (DOT) today opened bids for the long-anticipated I-84 widening project in Waterbury and I-84 Constructors Joint Venture is the apparent low bidder for the contract at $260.55 million. The DOT now has 60 days to review the three bids received and will then award a contract; some preliminary work will begin before the end of 2014, and full construction will begin in the spring of 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555450
The Connecticut Department of Transportation (DOT) today opened bids for the long-anticipated I-84 widening project in Waterbury and I-84 Constructors Joint Venture is the apparent low bidder for the contract at $260.55 million. The DOT now has 60 days to review the three bids received and will then award a contract; some preliminary work will begin before the end of 2014, and full construction will begin in the spring of 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555450
Tuesday, October 21, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Rehabilitation of Bridge Number 00410, Route 2 over New England Central Railroad in Norwich
The Connecticut Department of Transportation is announcing the temporary closing of the Route 2 Eastbound on ramp for Exit 29 and the Route 2 Westbound off ramp for Exit 29 in Norwich beginning October 24, 2014. The Detour Plan will be in effect on October 24, 2014 and will remain in effect through the end of November 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555318
The Connecticut Department of Transportation is announcing the temporary closing of the Route 2 Eastbound on ramp for Exit 29 and the Route 2 Westbound off ramp for Exit 29 in Norwich beginning October 24, 2014. The Detour Plan will be in effect on October 24, 2014 and will remain in effect through the end of November 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555318
Friday, October 17, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Milling of the off ramp from Route 15 Northbound to Route 372, and the on ramp from Route 372 to Route 15 Northbound in Berlin
The Connecticut Department of Transportation is announcing that a ramp milling project from
Route 372 to Route 15 Northbound in Berlin will be performed on Tuesday, October 21, 2014. A detour will be required.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555192
The Connecticut Department of Transportation is announcing that a ramp milling project from
Route 372 to Route 15 Northbound in Berlin will be performed on Tuesday, October 21, 2014. A detour will be required.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555192
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Resurfacing Project along Hopyard Road in East Haddam
The Connecticut Department of Transportation is announcing that a resurfacing project will be performed on Hopyard Road (SSR 434) in East Haddam beginning Monday, October 20, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555186
The Connecticut Department of Transportation is announcing that a resurfacing project will be performed on Hopyard Road (SSR 434) in East Haddam beginning Monday, October 20, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555186
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Milling and Resurfacing on Route 8 N/B in Ansonia
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on Route 8 northbound in Ansonia beginning Monday, October 20, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555174
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on Route 8 northbound in Ansonia beginning Monday, October 20, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555174
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lighting Maintenance along I-84 & Rte. 8 in Waterbury
The Connecticut Department of Transportation is announcing the maintenance of highway lighting along I-84 and Route * in Waterbury.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555156
The Connecticut Department of Transportation is announcing the maintenance of highway lighting along I-84 and Route * in Waterbury.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555156
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections October 19-24, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, October 19-24, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555154
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, October 19-24, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555154
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
MOTORIST ADVISORY - Expect Traffic Impacts Beginning Friday Night, October 17 Through the Morning of Monday, October 20, 2014 on the I-91 Southbound off-ramp to I-95 Southbound and the Route 34 Eastbound on-ramp to I-95 Southbound
The Connecticut Department of Transportation is announcing that construction activities related to traffic shifts on the I-91 Southbound off-ramp to I-95 Southbound and the Route 34 Eastbound on-ramp to I-95 Southbound, are expected to cause delays throughout the I-95 New Haven Corridor the weekend of Friday, October 17 through the morning of Monday, October 20, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554868
The Connecticut Department of Transportation is announcing that construction activities related to traffic shifts on the I-91 Southbound off-ramp to I-95 Southbound and the Route 34 Eastbound on-ramp to I-95 Southbound, are expected to cause delays throughout the I-95 New Haven Corridor the weekend of Friday, October 17 through the morning of Monday, October 20, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554868
Thursday, October 16, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Joint Repair on the Charter Oak Bridge (Route 15 Southbound) over the Connecticut River
The Connecticut Department of Transportation is announcing that work is scheduled on Route 15 southbound on the Charter Oak Bridge over the Connecticut River to replace a bridge expansion joint and to repair the approach at the south end of the bridge.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555032
The Connecticut Department of Transportation is announcing that work is scheduled on Route 15 southbound on the Charter Oak Bridge over the Connecticut River to replace a bridge expansion joint and to repair the approach at the south end of the bridge.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=555032
Wednesday, October 15, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
MOTORIST ADVISORY - Expect Traffic Impacts Beginning Friday Night, October 17 Through the Morning of Monday, October 20, 2014 on the I-91 Southbound off-ramp to I-95 Southbound and the Route 34 Eastbound on-ramp to I-95 Southbound
The Connecticut Department of Transportation is announcing that construction activities related to traffic shifts on the I-91 Southbound off-ramp to I-95 Southbound and the Route 34 Eastbound on-ramp to I-95 Southbound, are expected to cause delays throughout the I-95 New Haven Corridor the weekend of Friday, October 17 through the morning of Monday, October 20, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554868
The Connecticut Department of Transportation is announcing that construction activities related to traffic shifts on the I-91 Southbound off-ramp to I-95 Southbound and the Route 34 Eastbound on-ramp to I-95 Southbound, are expected to cause delays throughout the I-95 New Haven Corridor the weekend of Friday, October 17 through the morning of Monday, October 20, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554868
Friday, October 10, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Bridge Maintenance on I-95 in Stratford
The Connecticut Department of Transportation is announcing that nighttime bridge maintenance will be performed on eight bridges on I-95 northbound in Stratford beginning on the evening of Tuesday, October 14, and continuing through the morning of Friday, October 31, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554812
The Connecticut Department of Transportation is announcing that nighttime bridge maintenance will be performed on eight bridges on I-95 northbound in Stratford beginning on the evening of Tuesday, October 14, and continuing through the morning of Friday, October 31, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554812
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Maintenance on Two I-84 Bridges Newtown
The Connecticut Department of Transportation is announcing that a nighttime maintenance project will be performed on two I-84 bridges in Newtown, October 15-17, 2014. The bridges carry I-84 over Hanover Road and Boulevard.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554788
The Connecticut Department of Transportation is announcing that a nighttime maintenance project will be performed on two I-84 bridges in Newtown, October 15-17, 2014. The bridges carry I-84 over Hanover Road and Boulevard.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554788
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections October 11-24, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, October 11-24, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554784
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, October 11-24, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554784
Thursday, October 9, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Bridge Maintenance along Route 2 in East Hartford
The Connecticut Department of Transportation is announcing that nighttime bridge maintenance will begin Tuesday, October 14, 2014, on six bridges along Route 2 in East Hartford.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554708
The Connecticut Department of Transportation is announcing that nighttime bridge maintenance will begin Tuesday, October 14, 2014, on six bridges along Route 2 in East Hartford.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554708
Tuesday, October 7, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Broad Street in Hartford Closed to Vehicle Traffic Between Capitol Avenue and Farmington Avenue from 6 AM Sunday, October 12 until 5 AM Monday, October 13.
The Connecticut Department of Transportation is announcing that Broad Street from Capitol Avenue to Farmington Avenue and access to I-84 eastbound in Hartford will also be closed to vehicles from 6 AM on Sunday, October 12 until 5 AM on Monday, October 13.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554566
The Connecticut Department of Transportation is announcing that Broad Street from Capitol Avenue to Farmington Avenue and access to I-84 eastbound in Hartford will also be closed to vehicles from 6 AM on Sunday, October 12 until 5 AM on Monday, October 13.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554566
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Public Information Meeting Concerning State Project No. 32-130 - Reconstruction of Route 31 in Coventry
The Connecticut Department of Transportation (CTDOT) will conduct a public information meeting concerning the proposed reconstruction of Route 31(Main Street) on Wednesday, October 29, 2014 at the Coventry High School, Lecture Hall, 78 Ripley Hill Road, Coventry, CT 06238. Open house will be held between 7:00 – 7:30 p.m. with a formal presentation at 7:30 p.m. Residents, commuters, business owners, and other interested individuals are encouraged to take advantage of this opportunity to learn about and discuss the proposed project.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554472
The Connecticut Department of Transportation (CTDOT) will conduct a public information meeting concerning the proposed reconstruction of Route 31(Main Street) on Wednesday, October 29, 2014 at the Coventry High School, Lecture Hall, 78 Ripley Hill Road, Coventry, CT 06238. Open house will be held between 7:00 – 7:30 p.m. with a formal presentation at 7:30 p.m. Residents, commuters, business owners, and other interested individuals are encouraged to take advantage of this opportunity to learn about and discuss the proposed project.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554472
Thursday, October 2, 2014
ConnDOT eAlert: News from the Connecticut Department of Transportation
Bus Service for Some New Canaan Branch Trains October 3-5
Buses will be substituted for some off-peak trains this Friday, Saturday and Sunday – October 3-5 – on the New Canaan Branch of the New Haven commuter rail line to allow for track maintenance. The New Canaan Branch operates between New Canaan and Stamford, making connections to New York City and New Haven.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=554274
Buses will be substituted for some off-peak trains this Friday, Saturday and Sunday – October 3-5 – on the New Canaan Branch of the New Haven commuter rail line to allow for track maintenance. The New Canaan Branch operates between New Canaan and Stamford, making connections to New York City and New Haven.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=554274
Tuesday, September 30, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Replacement of Overhead Sign Supports on I-95, I-84, Route 8 and Route 9 in Fairfield, Derby, Waterbury, North Haven, Farmington, Newington, Windsor Locks, Vernon, Old Saybrook, and Groton
The Connecticut Department of Transportation is announcing the start of work on Monday October 6, 2014 to replace overhead sign supports on I-95, I-84, Route 8 and Route 9 in the towns of Fairfield, Derby, Waterbury, North Haven, Farmington, Newington, Windsor Locks, Vernon, Old Saybrook, and Groton.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554002
The Connecticut Department of Transportation is announcing the start of work on Monday October 6, 2014 to replace overhead sign supports on I-95, I-84, Route 8 and Route 9 in the towns of Fairfield, Derby, Waterbury, North Haven, Farmington, Newington, Windsor Locks, Vernon, Old Saybrook, and Groton.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=554002
Monday, September 29, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections September 29-October 3, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, September 29-October 3, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553970
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, September 29-October 3, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553970
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
MOTORIST ADVISORY - Expect Weekend Traffic Impacts Friday, October 3 through the morning of Monday, October 6, 2014 on the I-91 Southbound off-ramp to I-95 Northbound and the Wooster Street on-ramp to I-95 Northbound
The Connecticut Department of Transportation is announcing that construction activities related to bridge construction are expected to cause delays throughout the I-95 New Haven corridor the weekend of Friday, October 3 through the morning of Monday, October 6, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553960
The Connecticut Department of Transportation is announcing that construction activities related to bridge construction are expected to cause delays throughout the I-95 New Haven corridor the weekend of Friday, October 3 through the morning of Monday, October 6, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553960
Friday, September 26, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Work to begin on I-95 Northbound Exit 28 off-Ramp to Route 127 (East Main Street) Bridgeport
The Connecticut Department of Transportation is announcing that physical work related to the widening of the I-95 Northbound Exit 28 off-ramp to Route 127 is expected to begin on October 1, 2014, and last about 1 month.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553830
The Connecticut Department of Transportation is announcing that physical work related to the widening of the I-95 Northbound Exit 28 off-ramp to Route 127 is expected to begin on October 1, 2014, and last about 1 month.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553830
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Updated Scheduled For 24-Hour Weekend Closures on Route 130 (Fairfield Avenue) in Bridgeport
The Connecticut Department of Transportation is announcing that the closure schedule for Route 130, Fairfield Avenue, from Commerce Drive to Railroad Avenue eastbound has been revised. The current schedule is to close Route 130 on the weekend of October 10-12. This closure will be repeated every weekend thereafter until end of December of 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553874
The Connecticut Department of Transportation is announcing that the closure schedule for Route 130, Fairfield Avenue, from Commerce Drive to Railroad Avenue eastbound has been revised. The current schedule is to close Route 130 on the weekend of October 10-12. This closure will be repeated every weekend thereafter until end of December of 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553874
Wednesday, September 24, 2014
ConnDOT eAlert: News from the Connecticut Department of Transportation
Substitute Buses for Some Trains on Waterbury Branch this Weekend
Buses will be substituted for some trains on the Waterbury branch of the New Haven Line this Friday, Saturday and Sunday (September 26-28) to accommodate work on a rail bridge in Seymour. The Waterbury branch operates between Waterbury and Bridgeport.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=553686
Buses will be substituted for some trains on the Waterbury branch of the New Haven Line this Friday, Saturday and Sunday (September 26-28) to accommodate work on a rail bridge in Seymour. The Waterbury branch operates between Waterbury and Bridgeport.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=553686
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Route 17A in Portland over Carr Brook Scheduled to Reopen to Traffic by Wednesday, October 8, 2014
The Connecticut Department of Transportation is announcing that route 17A over Carr Brook in Portland will be reopened to traffic by October 8, 2014, as the replacement of Bridge 02197 over Carr Brook nears completion.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553640
The Connecticut Department of Transportation is announcing that route 17A over Carr Brook in Portland will be reopened to traffic by October 8, 2014, as the replacement of Bridge 02197 over Carr Brook nears completion.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553640
Monday, September 22, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Work Extended: Route 58 in Bethel to Remain Closed For Replacement of Bridge over Putnam Brook through Wednesday, September 24 at 6 a.m.
The Connecticut Department of Transportation is announcing that Route 58 in Bethel between Starr Lane and Hoyts Hill Road will remain closed through Wednesday, September 24, at 6 a.m. for the completion of a bridge replacement over Putnam Brook near Sara's Way.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553474
The Connecticut Department of Transportation is announcing that Route 58 in Bethel between Starr Lane and Hoyts Hill Road will remain closed through Wednesday, September 24, at 6 a.m. for the completion of a bridge replacement over Putnam Brook near Sara's Way.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553474
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Expect I-95 New Haven Weeknight Traffic Impacts Monday, September 29 and Wednesday, October 1
The Connecticut Department of Transportation (CTDOT) is announcing that construction activities related to the installation of overhead signage on I-95 in the Long Wharf area are expected to cause delays throughout the I-95 New Haven Corridor during nighttime on Monday, September 29 and Wednesday, October 1, 2014. Hours will be between midnight and 5 a.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553464
The Connecticut Department of Transportation (CTDOT) is announcing that construction activities related to the installation of overhead signage on I-95 in the Long Wharf area are expected to cause delays throughout the I-95 New Haven Corridor during nighttime on Monday, September 29 and Wednesday, October 1, 2014. Hours will be between midnight and 5 a.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553464
Friday, September 19, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Maintenance on Route 8 in Bridgeport
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Route 8 northbound on the right shoulder in Bridgeport on Monday, September 22, 2014. This bridge carries Route 8 over Catherine Street.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553392
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Route 8 northbound on the right shoulder in Bridgeport on Monday, September 22, 2014. This bridge carries Route 8 over Catherine Street.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553392
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections September 21-24, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, September 21-24, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553386
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, September 21-24, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553386
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Rehabilitation of Bridge Number 00410, Route 2 over New England Central Railroad in Norwich
The Connecticut Department of Transportation is announcing the temporary closing of the Route 2 Eastbound on ramp Exit 29 and the Route 2 Westbound off ramp Exit 29 on October 10, 2014. The Detour Plan will be in effect on October 10, 2014 and will remain in effect through mid-November 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553356
The Connecticut Department of Transportation is announcing the temporary closing of the Route 2 Eastbound on ramp Exit 29 and the Route 2 Westbound off ramp Exit 29 on October 10, 2014. The Detour Plan will be in effect on October 10, 2014 and will remain in effect through mid-November 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553356
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Bridge Maintenance on I-95 in Stamford
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-95 northbound and southbound in Stamford, beginning at 9 p.m. Monday, September 22, 2014. The work is expected to be completed by 5 a.m. on Friday, October 10.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553366
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-95 northbound and southbound in Stamford, beginning at 9 p.m. Monday, September 22, 2014. The work is expected to be completed by 5 a.m. on Friday, October 10.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553366
Monday, September 15, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Closure of I-84 Eastbound Off Ramp, Exit 48A, to Asylum Street in Hartford on Thursday, September 18, 2014
The Connecticut Department of Transportation is announcing that the I-84 eastbound off ramp to Asylum Street in Hartford (Exit 48A) will be closed from 10 p.m. Thursday, September 18, to 5 a.m. Friday, September 19, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553046
The Connecticut Department of Transportation is announcing that the I-84 eastbound off ramp to Asylum Street in Hartford (Exit 48A) will be closed from 10 p.m. Thursday, September 18, to 5 a.m. Friday, September 19, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=553046
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Rehabilitation of Society Road Bridge over I-95 in East Lyme
The Connecticut Department of Transportation is announcing that the rehabilitation of the society road bridge over I-95, and the reconstruction of East and West Society Road intersection in the own of East Lyme will begin September 19, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552974
The Connecticut Department of Transportation is announcing that the rehabilitation of the society road bridge over I-95, and the reconstruction of East and West Society Road intersection in the own of East Lyme will begin September 19, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552974
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Improvements to Route 73 (Main Street) in Watertown
The Connecticut Department of Transportation is announcing that construction activity will begin on Thursday, September 18, 2014 for improvements to Route 73 (Main St.) in the vicinity of Candee Hill Road in Watertown.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552956
The Connecticut Department of Transportation is announcing that construction activity will begin on Thursday, September 18, 2014 for improvements to Route 73 (Main St.) in the vicinity of Candee Hill Road in Watertown.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552956
Friday, September 12, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections September 14-21, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, September 14-21, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552920
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, September 14-21, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552920
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Overnight Bridge Maintenance Ramp Closure, I-91 at Exit 30 Ramp to I-84 in Hartford
The Connecticut Department of Transportation is announcing that a bridge maintenance repair will be performed on I-91 southbound at Exit 30 ramp to I-84 eastbound in Hartford, overnight Sunday/Monday, September 14-15, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552894
The Connecticut Department of Transportation is announcing that a bridge maintenance repair will be performed on I-91 southbound at Exit 30 ramp to I-84 eastbound in Hartford, overnight Sunday/Monday, September 14-15, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552894
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Maintenance on Route 2 Westbound in Colchester
The Connecticut Department of Transportation is announcing that bridge maintenance will be performed on the Route 2 bridge over Route 85 in Colchester beginning Monday, September 15, 2014. The project will continue through Friday, October 10.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552820
The Connecticut Department of Transportation is announcing that bridge maintenance will be performed on the Route 2 bridge over Route 85 in Colchester beginning Monday, September 15, 2014. The project will continue through Friday, October 10.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552820
Thursday, September 11, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Installation of New Gate Valves on West Main Street in Waterbury
The Connecticut Department of Transportation is announcing that the Waterbury Bureau of Water will be doing a nighttime project of installing new gate valves on the water main on SR 847 (West Main St.) between Gilbert Street and Willow Street in Waterbury, beginning Friday, September 12, at 6 p.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552758
The Connecticut Department of Transportation is announcing that the Waterbury Bureau of Water will be doing a nighttime project of installing new gate valves on the water main on SR 847 (West Main St.) between Gilbert Street and Willow Street in Waterbury, beginning Friday, September 12, at 6 p.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552758
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Rehabilitation of Bridge 03590, Gardner Street over I-384 & Birch Mountain Brook
The Connecticut Department of Transportation is announcing that the rehabilitation of Bridge 03590, Gardner Street over I-384 & Birch Mountain Brook in Manchester is scheduled to begin on or about Monday, September 15, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552734
The Connecticut Department of Transportation is announcing that the rehabilitation of Bridge 03590, Gardner Street over I-384 & Birch Mountain Brook in Manchester is scheduled to begin on or about Monday, September 15, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552734
Wednesday, September 10, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Guiderail Safety Improvements in Cromwell, Rocky Hill and Berlin
The Connecticut Department of Transportation is announcing that a Guiderail Safety Improvement Project will be performed on Route 3 in Cromwell/Rocky Hill, State Route 411 and Route 99 in Rocky Hill, Route 160 in Rocky Hill/Berlin and Route 372 in Berlin/Cromwell.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552682
The Connecticut Department of Transportation is announcing that a Guiderail Safety Improvement Project will be performed on Route 3 in Cromwell/Rocky Hill, State Route 411 and Route 99 in Rocky Hill, Route 160 in Rocky Hill/Berlin and Route 372 in Berlin/Cromwell.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552682
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Rehabilitation of Bridge 5466, SSR 450 (Horse Pond Road) over Huzzle Guzzle Brook in Madison
The Connecticut Department of Transportation is announcing the roadway closure of SSR 450 (Horse Pond Road) for the rehabilitation of Bridge 5466 in the town of Madison. Route 450 (Horse Pond Rd) will be completely closed and detoured from September 4, 2014, to October 15, 2014. The posted detour will utilize Route 79 during this 28-day period.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552666
The Connecticut Department of Transportation is announcing the roadway closure of SSR 450 (Horse Pond Road) for the rehabilitation of Bridge 5466 in the town of Madison. Route 450 (Horse Pond Rd) will be completely closed and detoured from September 4, 2014, to October 15, 2014. The posted detour will utilize Route 79 during this 28-day period.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552666
Tuesday, September 9, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections September 8-14, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, September 8-14, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552622
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, September 8-14, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552622
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
MOTORIST ADVISORY - Expect Weeknight Traffic Impacts Tuesday, September 16 and Thursday, September 18, 2014, as Traffic from I-95 Southbound to I-91 Northbound is Shifted into a New Alignment on the New Bridge to I-91 Northbound
The Connecticut Department of Transportation is announcing that construction activities related to traffic shifts on I-95 Southbound to I-91 Northbound are expected to cause delays throughout the I-95 New Haven corridor the weeknights of Tuesday, September 16 and Thursday, September 18, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552614
The Connecticut Department of Transportation is announcing that construction activities related to traffic shifts on I-95 Southbound to I-91 Northbound are expected to cause delays throughout the I-95 New Haven corridor the weeknights of Tuesday, September 16 and Thursday, September 18, 2014. Please plan ahead and consider alternate routes to get to your destination.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552614
Monday, September 8, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Route 58 to be Closed for Replacement of Bridge over Putnam Brook in Bethel
The Connecticut Department of Transportation is announcing that the Route 58 bridge over Putnam Brook near the intersection of Sara's Way in Bethel will be removed and replaced, requiring the closure of Route 58 beginning Friday, September 19, at 6 p.m. through Tuesday at 6 a.m. September 23, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552532
The Connecticut Department of Transportation is announcing that the Route 58 bridge over Putnam Brook near the intersection of Sara's Way in Bethel will be removed and replaced, requiring the closure of Route 58 beginning Friday, September 19, at 6 p.m. through Tuesday at 6 a.m. September 23, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552532
Wednesday, September 3, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Bridge Maintenance, Various Bridges on I-91 NB and SB in New Haven
The bridge work consists of nighttime bridge maintenance on the bridges listed below. This work is scheduled to occur from 9:00 p.m. to 5:00 a.m. Monday, September 8, 2014, through Friday, October 10, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552320
The bridge work consists of nighttime bridge maintenance on the bridges listed below. This work is scheduled to occur from 9:00 p.m. to 5:00 a.m. Monday, September 8, 2014, through Friday, October 10, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552320
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Milling and Resurfacing Project, Route 175 in Wethersfield and Newington
The project consists of nighttime milling and resurfacing a 3.15 mile segment of Rte. 175 in Wethersfield and Newington. The milling segment of this project is scheduled to be performed Monday, September 8, 2014 to Friday, September 12, 2014. The resurfacing segment of this project is anticipated to be performed Sunday, September 14, 2014 to Monday, September 22, 2014. The regular work schedule for this project is 7:00 p.m. to 5:00 a.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552314
The project consists of nighttime milling and resurfacing a 3.15 mile segment of Rte. 175 in Wethersfield and Newington. The milling segment of this project is scheduled to be performed Monday, September 8, 2014 to Friday, September 12, 2014. The resurfacing segment of this project is anticipated to be performed Sunday, September 14, 2014 to Monday, September 22, 2014. The regular work schedule for this project is 7:00 p.m. to 5:00 a.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552314
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Traffic Shift Scheduled for I-95 Northbound Between Exits 45 and 46, Long Wharf Area in New Haven and West Haven
The Connecticut Department of Transportation is announcing that an additional section of I-95 northbound between Exits 45 and 46 is scheduled to be realigned to allow for continued work in the median for the replacement of the bridge over West River in New Haven and West Haven.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552322
The Connecticut Department of Transportation is announcing that an additional section of I-95 northbound between Exits 45 and 46 is scheduled to be realigned to allow for continued work in the median for the replacement of the bridge over West River in New Haven and West Haven.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552322
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Maintenance, Various Bridges on Route 40, NB and SB in North Haven
The work consists of bridge maintenance on the bridges listed below. This work is scheduled to occur Sunday, September 8, 2014 through Friday, September 26, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552318
The work consists of bridge maintenance on the bridges listed below. This work is scheduled to occur Sunday, September 8, 2014 through Friday, September 26, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552318
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Milling and Resurfacing Project, Route 12 in Norwich
The project consists of nighttime milling and resurfacing a 2.77 mile segment of Route 12 in Norwich. The milling is scheduled to occur Sunday, September 7, 2014, to Monday, September 15, 2014. The resurfacing segment of this project is anticipated to be performed on Tuesday, September 16, 2014, to Monday, September 29, 2014. The regular work schedule for this project is 8:00 p.m. to 5:00 a.m. (Sunday–Friday).
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552312
The project consists of nighttime milling and resurfacing a 2.77 mile segment of Route 12 in Norwich. The milling is scheduled to occur Sunday, September 7, 2014, to Monday, September 15, 2014. The resurfacing segment of this project is anticipated to be performed on Tuesday, September 16, 2014, to Monday, September 29, 2014. The regular work schedule for this project is 8:00 p.m. to 5:00 a.m. (Sunday–Friday).
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552312
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Crack & Joint Sealing Project, Rte. 2 WB in Bozrah & Lebanon
The project consists of cleaning and sealing a 4.07 mile segment of Rte. 2 WB in Bozrah and Lebanon. The crack and joint sealing project is scheduled to occur from Monday, September 8, 2014, through Friday, September 12, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552310
The project consists of cleaning and sealing a 4.07 mile segment of Rte. 2 WB in Bozrah and Lebanon. The crack and joint sealing project is scheduled to occur from Monday, September 8, 2014, through Friday, September 12, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552310
Thursday, August 28, 2014
ConnDOT eAlert: News from the Connecticut Department of Transportation
WHEN SPEEDING KILLS, IT'S NEVER AN ACCIDENT
With the arrival of Labor Day holiday weekend, many Connecticut residents will close the summer by traveling throughout the state to barbeques, family gatherings and tourist destinations. In an effort to raise awareness and change driver behavior, the State of Connecticut Department of Transportation Highway Safety Office is launching the first phase of its anti-speeding campaign throughout rural Connecticut, where most speeding-related automobile deaths occur.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=552100
With the arrival of Labor Day holiday weekend, many Connecticut residents will close the summer by traveling throughout the state to barbeques, family gatherings and tourist destinations. In an effort to raise awareness and change driver behavior, the State of Connecticut Department of Transportation Highway Safety Office is launching the first phase of its anti-speeding campaign throughout rural Connecticut, where most speeding-related automobile deaths occur.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=552100
Wednesday, August 27, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Weekend Closure for Replacement of Route 17 Bridge in Middletown
The Connecticut Department of Transportation is announcing that Route 17, South Main Street, in Middletown between Route 155 (Randolph Road) and Wesleyan Hills Road will be closed to through traffic beginning 7 p.m. Friday, September 5, and will reopen by 3 pm. Monday, September 8, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552066
The Connecticut Department of Transportation is announcing that Route 17, South Main Street, in Middletown between Route 155 (Randolph Road) and Wesleyan Hills Road will be closed to through traffic beginning 7 p.m. Friday, September 5, and will reopen by 3 pm. Monday, September 8, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=552066
Tuesday, August 26, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Ramp Closures for Route 8 Southbound Ramp to I-84 Eastbound, Exit 31, in Waterbury To Continue Through Friday September 5, 2014
The Connecticut Department of Transportation is announcing the continuation of overnight closures of the Route 8 southbound ramp to I-84 East, Exit 31, in Waterbury through Friday, September 5. No ramp closures will be allowed during the Labor Day holiday weekend from Friday, August 29 through Monday September 1.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551954
The Connecticut Department of Transportation is announcing the continuation of overnight closures of the Route 8 southbound ramp to I-84 East, Exit 31, in Waterbury through Friday, September 5. No ramp closures will be allowed during the Labor Day holiday weekend from Friday, August 29 through Monday September 1.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551954
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Ramp Closures scheduled for Exit 35 On-Ramp to Route 15 Southbound (Merritt Parkway)
The Connecticut Department of Transportation is announcing that temporary nighttime closures of the Route 15 Southbound, Exit 35 On-Ramp, is scheduled to start on or about Wednesday September 3, 2014 thru Friday September 5, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551952
The Connecticut Department of Transportation is announcing that temporary nighttime closures of the Route 15 Southbound, Exit 35 On-Ramp, is scheduled to start on or about Wednesday September 3, 2014 thru Friday September 5, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551952
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Replacement of Retaining Wall on Route 8 and 25 Southbound in Bridgeport
The Connecticut Department of Transportation is announcing that the replacement of the retaining wall on Route 8 and 25 south bound will begin on or about September 8, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551906
The Connecticut Department of Transportation is announcing that the replacement of the retaining wall on Route 8 and 25 south bound will begin on or about September 8, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551906
Monday, August 25, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Pavement Preservation Program On Route 8 in Trumbull, Stratford and Shelton
The purpose of this program is to enhance pavement performance by using cost-effective treatments to extend the service life of the existing pavement. A section of Route 8 in Trumbull, Stratford and Shelton has been identified as a candidate for this program. The Department is developing plans to mill and overlay the bituminous pavement on Route 8 from approximately 0.3 miles before exit 8 in Trumbull, to approximately 0.3 miles after exit 13 in the Shelton.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551844
The purpose of this program is to enhance pavement performance by using cost-effective treatments to extend the service life of the existing pavement. A section of Route 8 in Trumbull, Stratford and Shelton has been identified as a candidate for this program. The Department is developing plans to mill and overlay the bituminous pavement on Route 8 from approximately 0.3 miles before exit 8 in Trumbull, to approximately 0.3 miles after exit 13 in the Shelton.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551844
Friday, August 22, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections August 25-28, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, August 25-28, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551822
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, August 25-28, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551822
Thursday, August 21, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Closure and traffic detour on southbound US Rt.1 (East Main Street) and eastbound Ferry Blvd. in Stratford
The Connecticut Department of Transportation is announcing the closure and detour of traffic on southbound US Rt. 1(East Main Street) and eastbound Ferry Blvd. in Stratford during overnight hours for up to four (4) consecutive nights beginning on Thursday, September 4, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551756
The Connecticut Department of Transportation is announcing the closure and detour of traffic on southbound US Rt. 1(East Main Street) and eastbound Ferry Blvd. in Stratford during overnight hours for up to four (4) consecutive nights beginning on Thursday, September 4, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551756
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Milling and Resurfacing Project, Route 32 in Franklin
The project consists of milling and resurfacing a 5.19 mile segment of Route 32 in Franklin. The milling segment of this project is scheduled to occur from Monday, August 25, 2014, through Thursday, August 28, 2014. The resurfacing segment of this project is anticipated to be performed from Friday, August 29, 2014, through Monday, September 15, 2014. No work will be performed on Monday, September 1, 2014, Labor Day.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551752
The project consists of milling and resurfacing a 5.19 mile segment of Route 32 in Franklin. The milling segment of this project is scheduled to occur from Monday, August 25, 2014, through Thursday, August 28, 2014. The resurfacing segment of this project is anticipated to be performed from Friday, August 29, 2014, through Monday, September 15, 2014. No work will be performed on Monday, September 1, 2014, Labor Day.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551752
Wednesday, August 20, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Milling and Resurfacing Project, SR 664 (Lake St./Snake Meadow Rd.) in Plainfield & Killingly
The project consists of milling and resurfacing a 5.70 mile segment of SR 664 (Lake St./Snake Meadow Rd.) in Plainfield & Killingly. The milling segment of this project is scheduled to occur on Friday, August 22, 2014, and Monday, August 25, 2014. The resurfacing segment of this project is anticipated to be performed from Tuesday, September 2, 2014, through Monday, September 15, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551634
The project consists of milling and resurfacing a 5.70 mile segment of SR 664 (Lake St./Snake Meadow Rd.) in Plainfield & Killingly. The milling segment of this project is scheduled to occur on Friday, August 22, 2014, and Monday, August 25, 2014. The resurfacing segment of this project is anticipated to be performed from Tuesday, September 2, 2014, through Monday, September 15, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551634
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Rehabilitation of Bridge Number 00947, Route 34 over Naugatuck River in the Town of Derby
The Connecticut Department of Transportation is announcing that work for the second stage of construction is scheduled to begin Monday, August 25, 2014 for the rehabilitation of bridge number 00947, Route 34, Main Street, over the Naugatuck River in the town of Derby. Westbound Route 34 lanes will be shifted south to the center of the bridge, while the northern portion of the bridge is being reconstructed. This lane configuration is expected to be in place until the Spring of 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551632
The Connecticut Department of Transportation is announcing that work for the second stage of construction is scheduled to begin Monday, August 25, 2014 for the rehabilitation of bridge number 00947, Route 34, Main Street, over the Naugatuck River in the town of Derby. Westbound Route 34 lanes will be shifted south to the center of the bridge, while the northern portion of the bridge is being reconstructed. This lane configuration is expected to be in place until the Spring of 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551632
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Bearing Replacement Project – Gold Star Memorial Bridge Northbound (Interstate 95 NB over the Thames River in the Towns of Groton and new London)
The Connecticut Department of Transportation is announcing that construction work involving daytime lane closures will begin on August 26, 2014 on the northbound Goldstar Memorial Bridge in New London and Groton.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551628
The Connecticut Department of Transportation is announcing that construction work involving daytime lane closures will begin on August 26, 2014 on the northbound Goldstar Memorial Bridge in New London and Groton.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551628
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Rehabilitation of Bridge #00548 over I-84, US Route 7 and Beaver Brook
The Connecticut Department of Transportation is announcing that the rehabilitation of bridge #00548 (US Route 7 southbound) over I-84 westbound, US Route 7 northbound and Beaver Brook will be begin in September 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551620
The Connecticut Department of Transportation is announcing that the rehabilitation of bridge #00548 (US Route 7 southbound) over I-84 westbound, US Route 7 northbound and Beaver Brook will be begin in September 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551620
Tuesday, August 19, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Rehabilitation of Route 34 Bridge over Naugatuck River in Derby
The Connecticut Department of Transportation is announcing that work for the second stage of construction is scheduled to begin Monday, August 25, 2014, for the rehabilitation of Main Street (Route 34) bridge over the Naugatuck River in the town of Derby. Westbound Route 34 lanes will be shifted south, to the center of the bridge, while the northern portion of the bridge is being reconstructed. This lane configuration is expected to be in place until the Spring of 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551572
The Connecticut Department of Transportation is announcing that work for the second stage of construction is scheduled to begin Monday, August 25, 2014, for the rehabilitation of Main Street (Route 34) bridge over the Naugatuck River in the town of Derby. Westbound Route 34 lanes will be shifted south, to the center of the bridge, while the northern portion of the bridge is being reconstructed. This lane configuration is expected to be in place until the Spring of 2015.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551572
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Public Informational Meeting Concerning the Merritt Parkway Multi-Use Trail Feasibility Study
The Connecticut Department of Transportation (Department) will conduct a public informational meeting concerning the Merritt Parkway Multi-Use Trail Feasibility Study on Tuesday, September 16, 2014 at 7:00 p.m. in the Greenwich Town Hall Meeting Room, 101 Field Point Road, Greenwich, Connecticut.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551554
The Connecticut Department of Transportation (Department) will conduct a public informational meeting concerning the Merritt Parkway Multi-Use Trail Feasibility Study on Tuesday, September 16, 2014 at 7:00 p.m. in the Greenwich Town Hall Meeting Room, 101 Field Point Road, Greenwich, Connecticut.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551554
Monday, August 18, 2014
ConnDOT eAlert: News from the Connecticut Department of Transportation
CTfastrak Bus Unveiled at State Capitol, Followed by TOD Tour
The Connecticut Department of Transportation held a CTfastrak new bus unveiling ceremony and press conference today, followed by a transit-oriented development (TOD) tour of the CTfastrak bus rapid transit system.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=551510
The Connecticut Department of Transportation held a CTfastrak new bus unveiling ceremony and press conference today, followed by a transit-oriented development (TOD) tour of the CTfastrak bus rapid transit system.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=551510
Friday, August 15, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Replacement of Bridge No. 02481, Route 77 (Durham Road) in the Town of Guilford
The Department of Transportation is announcing the start of a traffic detour around the work site for the replacement of Bridge No. 02481 on Route 77 (Durham Road) in Guilford, commencing August 18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551458
The Department of Transportation is announcing the start of a traffic detour around the work site for the replacement of Bridge No. 02481 on Route 77 (Durham Road) in Guilford, commencing August 18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551458
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Highway Lighting Maintenance on I-84 in Danbury
The Connecticut Department of Transportation is announcing the maintenance of highway lighting on I-84, eastbound and westbound, from Exit 1 to Exit 8 in the city of Danbury, including on and off ramps on Saturday, August 16, 2014. Hours of work will be 5:30 a.m. to 10 a.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551448
The Connecticut Department of Transportation is announcing the maintenance of highway lighting on I-84, eastbound and westbound, from Exit 1 to Exit 8 in the city of Danbury, including on and off ramps on Saturday, August 16, 2014. Hours of work will be 5:30 a.m. to 10 a.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551448
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Bridge Maintenance on Route 15 in Orange
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on Route 15, northbound and southbound, in Orange beginning August 20, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551446
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on Route 15, northbound and southbound, in Orange beginning August 20, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551446
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections August 18-21, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, August 18-21, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551442
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, August 18-21, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551442
Wednesday, August 13, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Public Informational Meeting Concerning the Bethel Rail Station Parking Lot Expansion
The Connecticut Department of Transportation (Department) will conduct a public informational meeting concerning the proposed Bethel Rail Station parking lot expansion on Thursday, September 4, 2014 in the GP Room of the Bethel Town Hall, 1 School Street, Bethel, Connecticut. An open forum for individual discussions with Department officials will begin at 6:30 p.m., followed by a formal presentation at 7:00 p.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551302
The Connecticut Department of Transportation (Department) will conduct a public informational meeting concerning the proposed Bethel Rail Station parking lot expansion on Thursday, September 4, 2014 in the GP Room of the Bethel Town Hall, 1 School Street, Bethel, Connecticut. An open forum for individual discussions with Department officials will begin at 6:30 p.m., followed by a formal presentation at 7:00 p.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551302
Tuesday, August 12, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Public Information Meeting Regarding the Merritt Parkway Multi-use Trail Feasibility Study
The Connecticut Department of Transportation (Department) will conduct a public informational meeting concerning the Merritt Parkway Multi-Use Trail Feasibility Study on Thursday, September 4, 2014 at 7:00 p.m. in the Stratford Town Hall Council Chambers, 2725 Main Street, Stratford, Connecticut.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551128
The Connecticut Department of Transportation (Department) will conduct a public informational meeting concerning the Merritt Parkway Multi-Use Trail Feasibility Study on Thursday, September 4, 2014 at 7:00 p.m. in the Stratford Town Hall Council Chambers, 2725 Main Street, Stratford, Connecticut.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=551128
Friday, August 8, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections August 11-15, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, August 11-15, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550990
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, August 11-15, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550990
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Cables to be Installed over I-84 in Middlebury
The Connecticut Department of Transportation is announcing that Connecticut Light & Power will be pulling cables overhead on I-84 in Middlebury, a half-mile east of the South Street Bridge overpass on Saturday, August 9, 2014. Rain date is Sunday, August 10. A helicopter will be used in this operation.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550988
The Connecticut Department of Transportation is announcing that Connecticut Light & Power will be pulling cables overhead on I-84 in Middlebury, a half-mile east of the South Street Bridge overpass on Saturday, August 9, 2014. Rain date is Sunday, August 10. A helicopter will be used in this operation.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550988
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Cables to be Installed over I-84 in Middlebury
The Connecticut Department of Transportation is announcing that Connecticut Light & Power will be pulling cables overhead on I-84 in Middlebury, a half-mile east of the South Street Bridge overpass, Monday, August 11, through Thursday, August 14, 2014. A helicopter will be used in this operation.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550986
The Connecticut Department of Transportation is announcing that Connecticut Light & Power will be pulling cables overhead on I-84 in Middlebury, a half-mile east of the South Street Bridge overpass, Monday, August 11, through Thursday, August 14, 2014. A helicopter will be used in this operation.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550986
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Resurfacing Project on Route 302 in Bethel and Newtown
The Connecticut Department of Transportation is announcing that a milling and resurfacing project on an 8-mile section of Route 302 in Bethel and Newtown will continue through September 3, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550980
The Connecticut Department of Transportation is announcing that a milling and resurfacing project on an 8-mile section of Route 302 in Bethel and Newtown will continue through September 3, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550980
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Repairing Highway Illumination on Route 7 in Danbury
The Connecticut Department of Transportation is announcing the repairs to highway lighting on Route 7, NB & SB from Exit 7, (Vicinity of Danbury Airport) to I-84, Exit 3 (Lake Avenue); and the Route 7 to I-84 WB & EB Interchange Ramps.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550974
The Connecticut Department of Transportation is announcing the repairs to highway lighting on Route 7, NB & SB from Exit 7, (Vicinity of Danbury Airport) to I-84, Exit 3 (Lake Avenue); and the Route 7 to I-84 WB & EB Interchange Ramps.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550974
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Repairs in Eastern Connecticut
The Connecticut Department of Transportation is announcing that bridge repairs will be performed on various bridges in eastern Connecticut beginning Monday, August 11, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550972
The Connecticut Department of Transportation is announcing that bridge repairs will be performed on various bridges in eastern Connecticut beginning Monday, August 11, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550972
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Signal Cabinet Replacement on Route 188 in Southbury
The Connecticut Department of Transportation is announcing the replacement of a signal cabinet on
Route 188 at the I-84 WB Ramps and Old Waterbury Road in Southbury on Sunday, August 10, 2014. The traffic signal will be without power for approximately one hour.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550970
The Connecticut Department of Transportation is announcing the replacement of a signal cabinet on
Route 188 at the I-84 WB Ramps and Old Waterbury Road in Southbury on Sunday, August 10, 2014. The traffic signal will be without power for approximately one hour.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550970
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Resurfacing Project along Route 83 in Manchester and Vernon
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on a 3.4 mile segment of Route 83 in Manchester and Vernon through August 14, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550968
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on a 3.4 mile segment of Route 83 in Manchester and Vernon through August 14, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550968
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Closures Scheduled for Exit 31 Ramp from Route 8 Southbound to I-84 in Waterbury
The Connecticut Department of Transportation is announcing that the Route 8 southbound off ramp (Exit 31) to I-84 East in Waterbury is scheduled to be closed nightly from 10 p.m. to 6 a.m. on Thursday August 14, Monday August 18 through Thursday August 21, and Monday August 25 through Thursday August 28.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550966
The Connecticut Department of Transportation is announcing that the Route 8 southbound off ramp (Exit 31) to I-84 East in Waterbury is scheduled to be closed nightly from 10 p.m. to 6 a.m. on Thursday August 14, Monday August 18 through Thursday August 21, and Monday August 25 through Thursday August 28.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550966
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Closures Scheduled for Exit Ramp from Route 8 Southbound to I-84 East (Exit 31) in Waterbury
The Connecticut Department of Transportation is announcing that the Route 8 southbound off ramp (Exit 31) to I-84 East in Waterbury is scheduled to be closed nightly from 10 p.m. to 6 a.m. on Thursday August 14, Monday August 18 through Thursday August 21, and Monday August 25 through Thursday August 28.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550958
The Connecticut Department of Transportation is announcing that the Route 8 southbound off ramp (Exit 31) to I-84 East in Waterbury is scheduled to be closed nightly from 10 p.m. to 6 a.m. on Thursday August 14, Monday August 18 through Thursday August 21, and Monday August 25 through Thursday August 28.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550958
Wednesday, August 6, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Unscheduled Opening of the Mystic Rt 1 Bridge to Accommodate the Charles W. Morgan Ship Arrival
The Connecticut Department of Transportation is announcing that there will be an unscheduled opening on Wednesday, August 6, 2014 any time between 5p.m. and 5:30 p.m. of the Mystic River Bridge on Rte. 1 in Mystic.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550742
The Connecticut Department of Transportation is announcing that there will be an unscheduled opening on Wednesday, August 6, 2014 any time between 5p.m. and 5:30 p.m. of the Mystic River Bridge on Rte. 1 in Mystic.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550742
Tuesday, August 5, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Emergency Nighttime Rt 15 Bridge Maintenance in East in East Hartford
The Connecticut Department of Transportation is announcing that an emergency nighttime bridge maintenance project will be performed on the Route 15 southbound bridge over Route 2 and the Connecticut River in East Hartford. Hours will be from 8 p.m. Tuesday, August 5, through 5 a.m. Wednesday, August 6, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550332
The Connecticut Department of Transportation is announcing that an emergency nighttime bridge maintenance project will be performed on the Route 15 southbound bridge over Route 2 and the Connecticut River in East Hartford. Hours will be from 8 p.m. Tuesday, August 5, through 5 a.m. Wednesday, August 6, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550332
Monday, August 4, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Replacement Project on Route 43 over Hollenback River in Cornwall
The Connecticut Department of Transportation is announcing that the replacement of the bridge that carries Route 43 over the Hollenbeck River in the town of Cornwall is scheduled to start on Monday, August 18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550198
The Connecticut Department of Transportation is announcing that the replacement of the bridge that carries Route 43 over the Hollenbeck River in the town of Cornwall is scheduled to start on Monday, August 18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550198
Friday, August 1, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Maintenance on Route 16 over the Salmon River in East Hampton
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Route 16 over the Salmon River in East Hampton through August 15, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550078
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Route 16 over the Salmon River in East Hampton through August 15, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550078
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Milling and Resurfacing Project on Route 198 in Woodstock
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 198 in Woodstock through Friday, August 22, 2014. Lane closures will be required.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550074
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 198 in Woodstock through Friday, August 22, 2014. Lane closures will be required.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550074
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Bridge Maintenance on I-84 in East Hartford
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-84 WB over Route 44 eastbound and East River Drive in East Hartford beginning August 3, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550070
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on I-84 WB over Route 44 eastbound and East River Drive in East Hartford beginning August 3, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550070
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Highway Illumination Repairs on Route 7 Danbury
The Connecticut Department of Transportation is announcing repairs to highway lighting on Route 7, NB & SB from Exit 7, (Vicinity of Danbury Airport) to I-84, Exit 3 (Lake Avenue); also including Route 7 to I-84 WB & EB Interchange Ramps in Danbury.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550068
The Connecticut Department of Transportation is announcing repairs to highway lighting on Route 7, NB & SB from Exit 7, (Vicinity of Danbury Airport) to I-84, Exit 3 (Lake Avenue); also including Route 7 to I-84 WB & EB Interchange Ramps in Danbury.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550068
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections August 4-9, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, August 4-9, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550058
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, August 4-9, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=550058
Friday, July 25, 2014
ConnDOT eAlert: News from the Connecticut Department of Transportation
DOT and CCSU Host Summer Transportation Program for High School Students
The Department of Transportation's TRAC (Transportation and Civil Engineering) program is partnering with Central Connecticut State University to host a 1 week program from July 28 to August 1, 2014, to introduce a wide range of transportation modes to high school students from all over the state.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=549048
The Department of Transportation's TRAC (Transportation and Civil Engineering) program is partnering with Central Connecticut State University to host a 1 week program from July 28 to August 1, 2014, to introduce a wide range of transportation modes to high school students from all over the state.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=549048
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Deck Joint Inspection along Route 8 and I-95
The Connecticut Department of Transportation is announcing that inspections will be performed on the bridge joints on I-95 northbound in Guilford, I-95 southbound in Stamford and Greenwich and on Route 8 southbound in Shelton and Trumbull. These inspections will require daytime lane closures on Tuesday, July 29, and Wednesday July 30, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=549044
The Connecticut Department of Transportation is announcing that inspections will be performed on the bridge joints on I-95 northbound in Guilford, I-95 southbound in Stamford and Greenwich and on Route 8 southbound in Shelton and Trumbull. These inspections will require daytime lane closures on Tuesday, July 29, and Wednesday July 30, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=549044
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Rehabilitation of Rt 2 Bridge in Stonington
The Connecticut Department of Transportation is announcing that rehabilitation work on the Route 2 bridge over the Route 78 on ramp in Stonington is beginning July 25, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=549036
The Connecticut Department of Transportation is announcing that rehabilitation work on the Route 2 bridge over the Route 78 on ramp in Stonington is beginning July 25, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=549036
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Closure of I-95 Northbound Exit 44 Off Ramp on July 29, 2014
The Connecticut Department of Transportation is announcing that the I-95 Northbound Exit 44 off ramp to Kimberly Avenue will be closed on Tuesday night, July 29, 2014, from 11:00 p.m. to 6:00 a.m. the following morning for the emergency replacement of existing asphaltic plug joints on the bridge over the West River in the towns of New Haven and West Haven.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=549030
The Connecticut Department of Transportation is announcing that the I-95 Northbound Exit 44 off ramp to Kimberly Avenue will be closed on Tuesday night, July 29, 2014, from 11:00 p.m. to 6:00 a.m. the following morning for the emergency replacement of existing asphaltic plug joints on the bridge over the West River in the towns of New Haven and West Haven.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=549030
Wednesday, July 23, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Updated Scheduled For 24-Hour Weekend Closures on Route 130 (Fairfield Avenue) in Bridgeport
The Connecticut Department of Transportation is announcing that the closure schedule for Route 130, Fairfield Avenue, from Commerce Drive to Railroad Avenue eastbound has been revised. The current schedule is to close Route 130 on the weekend of August 1-3 and August 8-11, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548958
The Connecticut Department of Transportation is announcing that the closure schedule for Route 130, Fairfield Avenue, from Commerce Drive to Railroad Avenue eastbound has been revised. The current schedule is to close Route 130 on the weekend of August 1-3 and August 8-11, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548958
Tuesday, July 22, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Route 111 North of Cross Hill Road and Route 111 South of Route 110 in the town of Monroe will be closed starting on Monday August 11, 2014 through Wednesday August 20 , 2014
The Connecticut Department of Transportation is announcing the 10 day closure of Route 111 between Cross Hill Road and Route 110. The closure is needed to remove the existing structure, installation and backfill of a new precast concrete box culvert, precast wingwalls, construction of the cast-in-place parapets and reconstruct a portion of Route 111.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548900
The Connecticut Department of Transportation is announcing the 10 day closure of Route 111 between Cross Hill Road and Route 110. The closure is needed to remove the existing structure, installation and backfill of a new precast concrete box culvert, precast wingwalls, construction of the cast-in-place parapets and reconstruct a portion of Route 111.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548900
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Maintenance, Route 16 over the Salmon River in East Hampton
The project consists of the installation of beam rail across Bridge # 00853 on Route 16 over the Salmon River in East Hampton. Also included will be the approach rail to account for the realignment of the bridge attachments. This project is scheduled to occur from Monday, July 28, 2014 to Friday, August 1, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548888
The project consists of the installation of beam rail across Bridge # 00853 on Route 16 over the Salmon River in East Hampton. Also included will be the approach rail to account for the realignment of the bridge attachments. This project is scheduled to occur from Monday, July 28, 2014 to Friday, August 1, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548888
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Resurfacing Project, Route 83 in Manchester and Vernon
The project consists of resurfacing a 3.38 mile segment of Route 83 in Manchester and Vernon. The milling segment of this project is anticipated to be performed on Sunday, July 27, 2014 to Thursday, July 31, 2014. The resurfacing segment of this project is anticipated to be performed on Sunday, August 3, 2014 to Thursday, August 7, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548872
The project consists of resurfacing a 3.38 mile segment of Route 83 in Manchester and Vernon. The milling segment of this project is anticipated to be performed on Sunday, July 27, 2014 to Thursday, July 31, 2014. The resurfacing segment of this project is anticipated to be performed on Sunday, August 3, 2014 to Thursday, August 7, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548872
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Milling and Resurfacing Project, Route 195 in Mansfield
The project consists of milling and resurfacing a 1.04 mile segment of Route 195 in Mansfield. The milling segment of this project is scheduled to occur from Monday, July 28, 2014, through Tuesday, July 29, 2014. The resurfacing segment of this project is anticipated to be performed from Wednesday, July 30, 2014, through Friday, August 1, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548870
The project consists of milling and resurfacing a 1.04 mile segment of Route 195 in Mansfield. The milling segment of this project is scheduled to occur from Monday, July 28, 2014, through Tuesday, July 29, 2014. The resurfacing segment of this project is anticipated to be performed from Wednesday, July 30, 2014, through Friday, August 1, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548870
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Milling and Resurfacing Project, Route 202 in New Milford
The project consists of milling and resurfacing a 3.52 mile segment of Route 202 in New Milford. This project is scheduled to occur from 7:00 p.m. to 5:00 a.m. Monday, July 28, 2014 to the morning of Monday, August 11, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548868
The project consists of milling and resurfacing a 3.52 mile segment of Route 202 in New Milford. This project is scheduled to occur from 7:00 p.m. to 5:00 a.m. Monday, July 28, 2014 to the morning of Monday, August 11, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548868
Monday, July 14, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Bridge Maintenance on Rt. 15 Northbound over I-91 in Meriden
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on Rte. 15 Northbound over I-91 in Meriden, July 17-August 7, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548548
The Connecticut Department of Transportation is announcing that a nighttime bridge maintenance project will be performed on Rte. 15 Northbound over I-91 in Meriden, July 17-August 7, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548548
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Resurfacing on Routes 69 and 63 in New Haven
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on Routes 69 and 63 in New Haven, July 17-26, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548544
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on Routes 69 and 63 in New Haven, July 17-26, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548544
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Weekend Closing of I-84 Eastbound Off Ramp to Asylum Street in Hartford
The Connecticut Department of Transportation is announcing that the I-84 eastbound off ramp to Asylum Street in Hartford (Exit 48A) will be closed from 10:00 p.m. Friday, July 18, to 5:00 a.m. Monday, July 21, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548530
The Connecticut Department of Transportation is announcing that the I-84 eastbound off ramp to Asylum Street in Hartford (Exit 48A) will be closed from 10:00 p.m. Friday, July 18, to 5:00 a.m. Monday, July 21, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548530
Friday, July 11, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Resurfacing on Routes 5 and 517 in East Hartford
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on Route 5 and SR 517 in East Hartford, July 13-25, 2014
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548508
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on Route 5 and SR 517 in East Hartford, July 13-25, 2014
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548508
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Resurfacing Project on Whitehead Highway in Hartford
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on the Whitehead Highway, eastbound and westbound, in Hartford.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548502
The Connecticut Department of Transportation is announcing that a nighttime milling and resurfacing project will be performed on the Whitehead Highway, eastbound and westbound, in Hartford.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548502
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Ramp Closures Scheduled for I-84 Ramp over Meadow Street, Exit 21, in Waterbury
The Connecticut Department of Transportation is announcing that the I-84 East off ramp at Exit 21, Meadow Street in Waterbury is scheduled to be closed nightly from 10 p.m. to 6 a.m. from Wednesday, July 16 through Thursday, July 17, and Monday, July 21, through Thursday, July 24, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548496
The Connecticut Department of Transportation is announcing that the I-84 East off ramp at Exit 21, Meadow Street in Waterbury is scheduled to be closed nightly from 10 p.m. to 6 a.m. from Wednesday, July 16 through Thursday, July 17, and Monday, July 21, through Thursday, July 24, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548496
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections July 14-18, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, July 14-18, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548494
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, July 14-18, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548494
Thursday, July 10, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Street Sweeping on Route 8
The Connecticut Department of Transportation is announcing a nighttime street sweeping project on Route 8, northbound and southbound in the towns of Seymour, Beacon Falls and Naugatuck, from exit 20 to exit 29. This project is scheduled for Thursday, July 10, 2014, from 8:00 PM to 4:00 AM.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548460
The Connecticut Department of Transportation is announcing a nighttime street sweeping project on Route 8, northbound and southbound in the towns of Seymour, Beacon Falls and Naugatuck, from exit 20 to exit 29. This project is scheduled for Thursday, July 10, 2014, from 8:00 PM to 4:00 AM.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548460
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Rehab Work on I-91 in New Haven
The Connecticut Department of Transportation is announcing that a bridge rehabilitation project on I-91 northbound and southbound over State Street and Ferry Street in New Haven will begin on Monday, July 21, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548456
The Connecticut Department of Transportation is announcing that a bridge rehabilitation project on I-91 northbound and southbound over State Street and Ferry Street in New Haven will begin on Monday, July 21, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548456
Wednesday, July 9, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Bridge Maintenance on I-91 Southbound in Wallingford
The Connecticut Department of Transportation is announcing that a bridge maintenance project is being performed on Bridge 03125 over I-91 southbound in Wallingford through July 18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548412
The Connecticut Department of Transportation is announcing that a bridge maintenance project is being performed on Bridge 03125 over I-91 southbound in Wallingford through July 18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548412
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Utility Project on Whitehead Highway in Hartford, Detour Required
The Connecticut Department of Transportation is announcing a utility project on Whitehead Highway
in Hartford on Saturday, July 12, 2014 between 10 a.m. and 11 a.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548410
The Connecticut Department of Transportation is announcing a utility project on Whitehead Highway
in Hartford on Saturday, July 12, 2014 between 10 a.m. and 11 a.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548410
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Traffic-Counting Loop Installation on I-95 Northbound and Southbound in Darien
The Connecticut Department of Transportation is announcing that a nighttime traffic-counting loop installation project will be performed on Interstate 95 Northbound and Southbound in Darien, July 14-18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548408
The Connecticut Department of Transportation is announcing that a nighttime traffic-counting loop installation project will be performed on Interstate 95 Northbound and Southbound in Darien, July 14-18, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548408
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Milling and Resurfacing along Route 198 in Woodstock
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be
performed on Route 198 in Woodstock, July 14-21, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548404
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be
performed on Route 198 in Woodstock, July 14-21, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548404
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Rehabilitation of Rt. 2 Bridge over New England Central Railroad in Norwich
The Connecticut Department of Transportation is announcing the start of rehabilitation of Bridge Number 00410 on Route 2 in Norwich beginning on July 21, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548398
The Connecticut Department of Transportation is announcing the start of rehabilitation of Bridge Number 00410 on Route 2 in Norwich beginning on July 21, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548398
ConnDOT eAlert: News from the Connecticut Department of Transportation
Ride the Rails to the Sails - Sailfest in New London, July 11-13
Leave the car and traffic behind and take a train ride to this year's Sailfest in New London. The three-day festival, held at Waterfront Park July 11-13, will feature a major fireworks display, amusement rides, free entertainment, a Tall Ship, and over 200 vendors.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=548396
Leave the car and traffic behind and take a train ride to this year's Sailfest in New London. The three-day festival, held at Waterfront Park July 11-13, will feature a major fireworks display, amusement rides, free entertainment, a Tall Ship, and over 200 vendors.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=548396
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Ride the Rails to the Sails - Sailfest in New London, July 11-13, 2014
Leave the car and traffic behind and take a ride to this year's Sailfest in New London. The three-day festival, held at Waterfront Park will feature a a major fireworks display, amusement rides, free entertainment, a Tall Ship, and over 200 vendors.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548394
Leave the car and traffic behind and take a ride to this year's Sailfest in New London. The three-day festival, held at Waterfront Park will feature a a major fireworks display, amusement rides, free entertainment, a Tall Ship, and over 200 vendors.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548394
ConnDOT eAlert: News from the Connecticut Department of Transportation
Busing on Danbury Branch for Three Saturdays to Accommodate Planned Testing of New Signals
To allow for testing of the new signal system on the Danbury branch, buses will operate in place of six trains on each of three Saturdays, July 12, 19 & 26, to accommodate planned testing of grade crossings.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=548388
To allow for testing of the new signal system on the Danbury branch, buses will operate in place of six trains on each of three Saturdays, July 12, 19 & 26, to accommodate planned testing of grade crossings.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=548388
Tuesday, July 8, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Ramp Closures Scheduled for Route 7 Ramps At Backus Avenue, Exit 8, in Danbury
The Connecticut Department of Transportation is announcing that the Route 7 South off ramp, and the on ramp to Route 7 north at Exit 8, Backus Avenue in Danbury is scheduled to be closed nightly from 10 p.m. to 6 a.m. from Tuesday, July 8 through Thursday, July 10, and Monday, July 14, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548358
The Connecticut Department of Transportation is announcing that the Route 7 South off ramp, and the on ramp to Route 7 north at Exit 8, Backus Avenue in Danbury is scheduled to be closed nightly from 10 p.m. to 6 a.m. from Tuesday, July 8 through Thursday, July 10, and Monday, July 14, 2014.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548358
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Hamilton Street in Hartford Closed Between Francis Avenue and Bartholomew Avenue, July 14-18
The Connecticut Department of Transportation is announcing that Hamilton Street in Hartford will be closed between Francis Avenue and Bartholomew Avenue beginning at 7:00 a.m. Monday, July 14, 2014. This will be a full, around-the-clock closure that is expected to last five days.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548252
The Connecticut Department of Transportation is announcing that Hamilton Street in Hartford will be closed between Francis Avenue and Bartholomew Avenue beginning at 7:00 a.m. Monday, July 14, 2014. This will be a full, around-the-clock closure that is expected to last five days.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=548252
Friday, June 27, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections June 30-July 2, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, June 30-July 2, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=547740
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, June 30-July 2, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=547740
Thursday, June 26, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
IMPORTANT TRAVEL REMINDER! - Interstate 84 to Close at Exit 30 in Southington Weekend of June 27-29, 2014 for Bridge Replacement Work
The Connecticut Department of Transportation is reminding motorists and travelers that Interstate 84 will be closed in both directions to all traffic at Exit 30, Marion Avenue in Southington, on Friday night June 27 and is scheduled to reopen Monday morning, June 30, 2014. MAJOR TRAFFIC DELAYS ARE ANTICIPATED! – MOTORISTS ARE ENCOURAGED TO PLAN AHEAD, AVOID THE AREA, AND TO SEEK ALTERNATIVE ROUTES! Suggested alternate routes include I-91, I-691, Route 9 and Route 72. Local detours are established for residents and businesses in the area surrounding the construction site and signs will be posted.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=547068
The Connecticut Department of Transportation is reminding motorists and travelers that Interstate 84 will be closed in both directions to all traffic at Exit 30, Marion Avenue in Southington, on Friday night June 27 and is scheduled to reopen Monday morning, June 30, 2014. MAJOR TRAFFIC DELAYS ARE ANTICIPATED! – MOTORISTS ARE ENCOURAGED TO PLAN AHEAD, AVOID THE AREA, AND TO SEEK ALTERNATIVE ROUTES! Suggested alternate routes include I-91, I-691, Route 9 and Route 72. Local detours are established for residents and businesses in the area surrounding the construction site and signs will be posted.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=547068
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Nighttime Street Sweeping on Route 8, June 26-27
The Connecticut Department of Transportation is announcing a nighttime street sweeping operation on Route 8, northbound and southbound, in the towns of Derby, Ansonia, Seymour, Beacon Falls and Naugatuck, June 26-27, 2014. Hours of the operation will be from 8 p.m. to 4 a.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=547634
The Connecticut Department of Transportation is announcing a nighttime street sweeping operation on Route 8, northbound and southbound, in the towns of Derby, Ansonia, Seymour, Beacon Falls and Naugatuck, June 26-27, 2014. Hours of the operation will be from 8 p.m. to 4 a.m.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=547634
ConnDOT eAlert: News from the Connecticut Department of Transportation
Reminder: Schedule Adjustments Effective Monday, July 7
Metro-North will make adjustments to its New Haven and Harlem Line service on Monday, July 7, after closely monitoring performance, taking customer counts and listening to customer suggestions following the implementation of our the 11 schedule change.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=547592
Metro-North will make adjustments to its New Haven and Harlem Line service on Monday, July 7, after closely monitoring performance, taking customer counts and listening to customer suggestions following the implementation of our the 11 schedule change.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=547592
Wednesday, June 25, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
DOT Issues RFPs for I-84 Widening Project in Waterbury
The Connecticut Department of Transportation today issued Requests for Proposals (RFPs) for the I-84 widening project between Exits 23 and 25A in Waterbury. The project will add a third lane in each direction in the 2.7-mile section of the interstate highway – an area that has been a particular bottleneck for years during rush hour.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=547500
The Connecticut Department of Transportation today issued Requests for Proposals (RFPs) for the I-84 widening project between Exits 23 and 25A in Waterbury. The project will add a third lane in each direction in the 2.7-mile section of the interstate highway – an area that has been a particular bottleneck for years during rush hour.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=547500
Monday, June 16, 2014
ConnDOT eAlert: News from the Connecticut Department of Transportation
DOT Inspection Teams, Engineers and Metro-North Crews Converge on Walk Bridge
At the direction of Governor Dannel P. Malloy, and in partnership with MTA Chairman and CEO Thomas F. Prendergast and Metro-North Railroad President Joseph Giulietti, CTDOT Commissioner James P. Redeker has assembled a Short Term Action Team (STAT) to review, investigate and determine next steps, all to be taken in the near term, to improve the mechanical reliability of the Walk Bridge.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=546760
At the direction of Governor Dannel P. Malloy, and in partnership with MTA Chairman and CEO Thomas F. Prendergast and Metro-North Railroad President Joseph Giulietti, CTDOT Commissioner James P. Redeker has assembled a Short Term Action Team (STAT) to review, investigate and determine next steps, all to be taken in the near term, to improve the mechanical reliability of the Walk Bridge.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=1373&Q=546760
Friday, June 13, 2014
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Oakwood Avenue in West Hartford Closed Between New Park Avenue and Tolles Street The Week of Monday, June 23, to Friday, June 27, 2014
The Connecticut Department of Transportation is announcing that Oakwood Avenue in West Hartford will be closed between New Park Avenue and Tolles Street beginning at 7:00 a.m. Monday, June 23, 2014. This will be a full, around-the-clock closure that is expected to last five days.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=546702
The Connecticut Department of Transportation is announcing that Oakwood Avenue in West Hartford will be closed between New Park Avenue and Tolles Street beginning at 7:00 a.m. Monday, June 23, 2014. This will be a full, around-the-clock closure that is expected to last five days.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=546702
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Lane Closures for Bridge Inspections June 16-20, 2014
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, June 16-20, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=546688
Lane closures for bridge safety inspections and evaluations will be required around Connecticut, June 16-20, 2014. View the complete list and plan ahead.
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=546688
ConnDOT eAlert: Construction News from the Connecticut Department of Transportation
Upgrades to Pedestrian Control Features at Traffic Control Signals in Various Central Connecticut Towns
The Connecticut Department of Transportation (Department) is developing plans to upgrade pedestrian control features at 16 existing state maintained traffic control signals to include countdown pedestrian indications, accessible pedestrian signals and detectors in the cities/towns of Berlin, East Hartford, Hartford, Manchester, Middletown, Rocky Hill, Vernon, West Hartford and Wethersfield. The following intersections are included:
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=546628
The Connecticut Department of Transportation (Department) is developing plans to upgrade pedestrian control features at 16 existing state maintained traffic control signals to include countdown pedestrian indications, accessible pedestrian signals and detectors in the cities/towns of Berlin, East Hartford, Hartford, Manchester, Middletown, Rocky Hill, Vernon, West Hartford and Wethersfield. The following intersections are included:
For more information, please visit the ConnDOT website: http://www.ct.gov/dot/cwp/view.asp?a=2135&Q=546628
Subscribe to:
Posts (Atom)